RANCANGAN LOAD DEFENSE SCHEME BERBASIS UNDER FREQUENCY RELAY (UFR) UNTUK MENJAGA KESTABILAN SISTEM PADA SULAWESI UTARA DAN GORONTALO

Pamungkas, Bayu Putra and Senen, Adri (2024) RANCANGAN LOAD DEFENSE SCHEME BERBASIS UNDER FREQUENCY RELAY (UFR) UNTUK MENJAGA KESTABILAN SISTEM PADA SULAWESI UTARA DAN GORONTALO. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 202011124 BAYU PUTRA PAMUNGKAS.pdf] Text
SKRIPSI 202011124 BAYU PUTRA PAMUNGKAS.pdf
Restricted to Registered users only

Download (5MB)

Abstract

Keandalan pada sistem kelistrikan Sulawesi utara dan gorontalo menjadi salah satu parameter yang harus diperhatikan. Perancangan skema pertahanan Under Frequency Load Shedding (UFLS) pada kelistrikan sulawesi utara dan gorontalo merupakan solusi yang diperlukan untuk menjaga kestabilan sistem kelistrikan saat sistem mengalami gangguan. Pada penelitian ini bertujuan agar dapat mengetahui kondisi frekuensi dan tegangan saat terjadi pelepasan pembangkit, malakukan seting relai dan melakukan analisa setelah dilakukan mitigasi gangguan. Pada penelitian ini skema UFLS diterapkan ketika sistem kelistrikan Sulawesi utara dan Gorontalo terjadi gangguan. Dengan melakukan simulasi pelepasan pembangkit dan sistem transmisi maka frekuensi sistem akan mengalami penurunan, dengan melakukan skema gangguan sebanyak 7 kasus gangguan. Setiap kasus ganggan dilakukannya mitigasi mengunakan Under Frequency Load Shedding (UFLS) dengan melepaska baban yang sama namun berbeda pada tahapannya tergantung dengan situasi simulasi yang dilakukan. Sehingga dapat disimpulkan bahwasannya metode UFLS dapat menjadi skema pertahanan untuk mempertahankan sistem agar kembali kondisi normal.

Reliability of the electricity system in North Sulawesi and Gorontalo is one of the parameters that must be considered. Designing an Under Frequency Load Shedding (UFLS) defense scheme for the North Sulawesi and Gorontalo electricity systems is a necessary solution to maintain the stability of the electricity system when the system experiences disturbances. This research aims to be able to determine the frequency and voltage conditions when the generator is discharged, carry out relay settings and carry out analysis after mitigating the disturbance. In this research, the UFLS scheme was applied when there was a disturbance in the electricity system of North Sulawesi and Gorontalo. By simulating the release of the generator and transmission system, the system frequency will decrease, by carrying out a disturbance scheme for 7 disturbance cases. In each case of interference, mitigation is carried out using Under Frequency Load Shedding (UFLS) by removing the same load but at different stages depending on the simulation situation being carried out. It can be concluded that the UFLS method can be a defense scheme to maintain the system so that it returns to normal condition

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Pelepasan Beban, UFLS load shedding. UFLS
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 03 Nov 2025 04:01
Last Modified: 03 Nov 2025 04:01
URI: https://repository.itpln.ac.id/id/eprint/3271

Actions (login required)

View Item
View Item