ANALISIS KINERJA BIAYA DAN WAKTU DENGAN METODE EARNED VALUE PADA PROYEK MODERNISASI JARINGAN IRIGASI RENTANG PAKET LSS-01 INDRAMAYU JAWA BARAT

Ardhiyanshah, Ahmad and Wirantina, Irma (2024) ANALISIS KINERJA BIAYA DAN WAKTU DENGAN METODE EARNED VALUE PADA PROYEK MODERNISASI JARINGAN IRIGASI RENTANG PAKET LSS-01 INDRAMAYU JAWA BARAT. Diploma thesis, ITPLN.

[thumbnail of Skripsi ahmad ardhiyanshah 201821023 27 Februari 2024.pdf] Text
Skripsi ahmad ardhiyanshah 201821023 27 Februari 2024.pdf
Restricted to Repository staff only

Download (7MB)

Abstract

Guna kualitas sarana dan prasarana dalam sektor pertanian maka perlu dilakukan pembangunan dan rehabilitasi pada jaringan irigasi, Dalam upaya meningkatkan efisiensi dan kinerja sistem irigasi, Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR) telah meluncurkan proyek rehabilitasi di daerah irigasi berskala besar. Proyek yang melibatkan modernisasi jaringan irigasi Rentang ini dilaksanakan oleh kontraktor terkemuka PT Hutama Karya dengan dukungan konsultan proyek dari PT Nippon Koei. Langkah ini diharapkan dapat memberikan dampak positif bagi produktivitas pertanian dan keberlanjutan pengelolaan sumber daya air di daerah tersebut. Dengan total harga proyek senilai 250 M. Progres pekerjaannya sudah mencapai 26.05%, dan ditargetkan akan selesai di awal tahun 2026. untuk merealisasikan target perencanaan tersebut perlu dilakukan penerapan manajemen waktu dan biaya sehingga dapat dilakukan pengendalian untuk mengetahui kinerja proyek. Dalam mengukur dan mengevaluasi kinerja proyek, salah satu metode yang efektif adalah metode Nilai Hasil (Earned Value). Metode ini melibatkan integrasi biaya, jadwal, dan kinerja pekerjaan untuk memberikan gambaran yang komprehensif tentang kemajuan proyek. Dengan cara ini, manajer proyek dapat secara sistematis menganalisis efisiensi penggunaan sumber daya, merencanakan lebih lanjut, dan mengidentifikasi potensi risiko atau kendala yang mungkin timbul selama pelaksanaan proyek. Temuan dari tinjauan yang dilakukan antara minggu ke 35 dan 44 menunjukkan bahwa biaya pelaksanaan proyek tidak melebihi anggaran yang telah diestimasi sebelumnya. Nilai Cost Performance Index (CPI) sebesar 1,002 dan nilai Schedule Performance Index (SPI) sebesar 1,280 ditemukan pada tahap tinjauan terakhir, atau minggu ke-44. Angka SPI lebih dari 1 (1,280) menyiratkan percepatan 5,7% dari jadwal yang diantisipasi sebelumnya, sementara nilai CPI lebih dari 1 menunjukkan bahwa proyek beroperasi sesuai atau di bawah anggaran. Hasil ini menunjukkan manajemen proyek yang efektif dan kemajuan yang solid untuk mencapai tujuan proyek sesuai dengan rencana awal. Hasil perkiraan biaya akhir proyek sebesar Rp Rp. 242,428,136,652.03 bila kecenderungan keadaan efektivitas pelaksanaan proyek sama seperti saat minggu ke-44 dalam peninjauan akhir dan waktu penyelesaian proyek 122 minggu Dimana artinya proyek akan selesai dari waktu yang telah dijadwalkan yaitu 157 minggu.

In an effort to improve the efficiency and performance of irrigation systems, the Ministry of Public Works and Public Housing (PUPR) has launched rehabilitation projects in large-scale irrigation areas.The project, which involves the modernization of the Rentang irrigation network, is being implemented by leading contractor PT Hutama Karya with the support of project consultants from PT Nippon Koei. The move is expected to have a positive impact on agricultural productivity and the sustainability of water resource management in the area. With a total project price of $250 million, The work progress has reached 26.05% and is targeted to be completed in early 2026. To realize the planning target, it is necessary to implement time and cost management so that control can be carried out to determine project performance. In measuring and evaluating project performance, one effective method is the Earned Value method. This method involves the integration of cost, schedule, and job performance to provide a comprehensive picture of project progress. In this way, project managers can systematically analyze the efficiency of resource use, plan further, and identify potential risks or constraints that may arise during project implementation. Findings from the reviews conducted between weeks 35 and 44 showed that the project implementation costs did not exceed the previously estimated budget. A Cost Performance Index (CPI) value of 1.002 and a Schedule Performance Index (SPI) value of 1.280 were found at the last review stage, or week 44. An SPI figure of more than 1 (1.280) implies a 5.7% acceleration of the previously anticipated schedule, while a CPI value of more than 1 indicates that the project is operating within or below budget. These results indicate effective project management and solid progress towards achieving the project objectives according to the original plan. The result of the estimated final project cost of Rp. 242,428,136,652.03 if the trend of project performance conditions is the same as at the end of the review, i.e., week 44, and the project completion time is 122 weeks, which means the project will be completed in a faster time than planned, i.e., 157 weeks.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Earned Value, Kinerja Biaya, Kinerja Waktu Earned Value, Cost Performance, Time Performance
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 28 Aug 2025 08:17
Last Modified: 28 Aug 2025 08:17
URI: https://repository.itpln.ac.id/id/eprint/333

Actions (login required)

View Item
View Item