Kurniawan, Indra and Widyastuti, Christine (2024) ANALISIS RUGI-RUGI DAYA PADA KONDISI BASE LOAD DAN PEAK LOAD DI SALURAN PENYULANG 20 KV GARDU INDUK BANTUL. Diploma thesis, ITPLN.
SKRIPSI 202011043 INDRA KURNIAWAN.pdf
Restricted to Registered users only
Download (5MB)
Abstract
Penelitian ini bertujuan untuk menganalisis rugi-rugi daya aktif dan reaktif pada saat kondisi base load dan peak load di saluran penyulang 20 kV Gardu Induk Bantul. Metode analisis data dari studi yang dilakukan ini dengan menggunakan perangkat lunak ETAP untuk simulasi rugi-rugi daya dan melakukan perhitungan manual untuk menentukan seberapa besar nilai kerugian daya dan jatuh tegangan pada kondisi beban dasar dan beban puncak. Beban dasar tertinggi pada hari libur sebesar 694,42 kW pada BNL 07, sedangkan saat beban puncak dihari libur tertinggi sebesar 1389,82 kW pada BNL 06. Kemudian saat beban dasar dihari kerja rugi daya aktif tertinggi terjadi pada BNL 07 sebesar 1041,07 kW, saat beban puncak dihari kerja kerugian nya sebesar 1317,33 kW terjadi pada BNL 06.Saat beban puncak lebih besar dibandingkan dengan beban dasar, hal ini dikarenakan pada jam tersebut beban nya meningkat sehingga kerugian daya nya menjadi lebih besar. Jatuh tegangan juga dapat mempengaruhi kerugian daya, dimana semakin besar jatuh tegangan nya maka kerugian daya nya juga besar. Hasil analisis dari simulasi dan perhitungan manual ini menunjukkan adanya beberapa perbedaan yang signifikan pada saat kondisi beban dasar dan beban puncak, dimana hal ini mempengaruhi efisiensi distribusi daya. Hal ini dapat membantu untuk meningkatkan kinerja dan keandalan sistem agar kerugian daya nya kecil.
This study aims to analyze the active and reactive power losses during base load and peak load conditions in the 20 kV feeder line of Bantul Substation. The data analysis method of this study is by using ETAP software for power loss simulation and performing manual calculations to determine the value of power loss and voltage drop in base load and peak load conditions. The highest base load on holidays is 694.42 kW at BNL 07, while the highest peak load on holidays is 1389.82 kW at BNL 06. Then when the base load on weekdays the highest active power loss occurs at BNL 07 of 1041.07 kW, when the peak load on weekdays the loss is 1317.33 kW occurs at BNL 06. When the peak load is greater than the base load, this is because at that hour the load increases so that the power loss becomes greater. Voltage drop can also affect power loss, where the greater the voltage drop, the greater the power loss. The results of the analysis of the simulation and manual calculations show that there are several significant differences during base load and peak load conditions, which affect the efficiency of power distribution. This can help to improve the performance and reliability of the system so that the power loss is small.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | rugi daya, base load, peak load, penyulang, simulasi ETAP power loss, base load, peak load, feeder, ETAP simulation |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 04 Nov 2025 07:42 |
| Last Modified: | 04 Nov 2025 07:42 |
| URI: | https://repository.itpln.ac.id/id/eprint/3363 |
