Sitohang, Jesse Ernest Wagner and Hutajulu, Albert Gifson (2024) ANALISIS PENERAPAN PLTS LISTRIK DESA BERBASIS OFF GIRD UNTUK KEBUTUHAN BEBAN DI DESA OKTARU PAPUA PEGUNUNGAN. Diploma thesis, ITPLN.
SKRIPSI 201911110 JESE ERNEST WAGNER SITOHANG.pdf
Restricted to Registered users only
Download (3MB)
Abstract
Penelitian ini mengkaji penerapan Pembangkit Listrik Tenaga Surya (PLTS) berbasis off-grid untuk memenuhi kebutuhan listrik di Desa Oktaru, Papua Pegunungan. Berdasarkan perancangan system SPEL PLTS berbasis off-grid yang telah dibangun dan perhitungan yang dilakukan secara manual, ditemukan bahwa ada empat panel surya yang digunakan, masing-masing 2 seri dan 1 paralel, dengan kapasitas 650Wp. Panel surya ini terhubung ke MPPT Epever XTRA 4210N, dan sebagai batterai yang digunakan untuk mensuplai kebutuhan rumah, batterai SOTO GMFJ-1500 yang digunakan. Berdasarkan konfigurasi perhitungan manual yang sudah dilakukan didapat hasil sebesar 21.900 kWh/tahun dari hasil supply batterai.Berdasarkan perhitungan yang telah dilakukan pada penelitian ini, didapat bahwa untuk membangun sistem SPEL PLTS pada penelitian ini, modal investasi yang diperlukan sebesar Rp.550.573.730 1 Unit SPEL di desa Oktaru, dan waktu yang diperlukan untuk mengembalikan modal investasi dari tahun ke 14 bulan ke 4. Berdasarkan perhitungan yang sudah dilakukan pada penelitian ini, nilai NPV dan PI menunjukkan nilai positif, maka proyek sistem SPEL PLTS berbasis system off-grid layak untuk diinvestasikan. Hasil dari perhitungan yang telah dilakukan pada penelitian ini menunjukkan bahwa hasil kelayakan investasi menunjukkan nilai NPV bertanda positif sebesar Rp. 191.564.259 dan PI sebesar 1,34.
This research examines the application of off-grid-based Solar Power Plant (PLTS) to meet electricity needs in Oktaru Village, Papua Mountains. Based on the design of the off-grid-based SPEL PLTS system that has been built and calculations carried out manually, it is found that there are four solar panels used, each of 2 series and 1 parallel, with a capacity of 650Wp. These solar panels are connected to an Epever XTRA 4210N MPPT, and as a battery used to supply the needs of the house, a SOTO GMFJ-1500 battery is used. Based on the configuration of manual calculations that have been carried out, the results obtained are 21,900 kWh / year from the results of battery supply.Based on the calculations that have been carried out in this study, it is found that to build the SPEL PLTS system in this study, the required investment capital is Rp.550.573.730, 1 SPEL Unit in Oktaru village, and the time required to return the investment capital from year 14 month 4. The results of the calculations that have been carried out in this study show that the NPV and PI values show positive values, so the SPEL PLTS system project based on the offgrid system is feasible to invest. The results of the calculations carried out in this study show that the investment feasibility results show a positive NPV value of Rp. 191.564.259 and PI of 1.34.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | PLTS Off-grid, SPEL , Elektrifikasi, PLTS Off-grid, SPEL , Electrification |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 05 Nov 2025 03:43 |
| Last Modified: | 05 Nov 2025 03:43 |
| URI: | https://repository.itpln.ac.id/id/eprint/3401 |