Pembangkit Listrik Tenaga Surya (PLTS) di Perumahan Duri Kosambi dirancang untuk memenuhi beban dar pukul 7 pagi sampai 5 sore sebesar 6 kWh. Dengan mempertimbangkan penurunan daya akibat suhu tinggi, menghasilkan daya efektif 188,2 W per modul dari kapasitas awal 200 Wp. Diperlukan 8 modul surya dengan luas total 10 m², disusun dalam satu string, dan inverter berkapasitas 2000W. Performance Ratio (PR) sistem mencapai 88%, menunjukkan efisiensi tinggi. Biaya operasional tahunan adalah Rp. 222.000, dengan nilai sekarang untuk 25 tahun sebesar Rp. 2.837.905, mengindikasikan dampak jangka panjang pada viabilitas finansial. Total biaya siklus hidup (LCC) mencapai Rp. 25.037.905, dengan faktor pemulihan (CRF) 0,078 untuk pembayaran tahunan. Biaya energi (COE) sebesar Rp. 855/kWh mencerminkan efektivitas biaya. Secara finansial, investasi menunjukkan hasil positif dengan Net Present Value (NPV) Rp. 220.346 dan Profitability Index (PI) 1,009, menandakan keuntungan bersih. Meskipun titik pengembalian tercapai dalam 23 tahun dan 4 bulan, proyek ini layak secara finansial dan berpotensi memberikan keuntungan jangka panjang.

The Solar Power Plant (PLTS) in Duri Kosambi Housing is designed to meet the load from 7 am to 5 pm of 6 kWh. Taking into account the power reduction due to high temperatures, it produces an effective power of 188.2 W per module from an initial capacity of 200 Wp. 8 solar modules with a total area of 10 m² are required, arranged in one string, and an inverter with a capacity of 2000W. The system Performance Ratio (PR) reaches 88%, indicating high efficiency. The annual operating cost is IDR 222,000, with a present value for 25 years of IDR 2,837,905, indicating a long-term impact on financial viability. The total life cycle cost (LCC) reaches IDR 25,037,905, with a recovery factor (CRF) of 0.078 for annual payments. The cost of energy (COE) of IDR 855/kWh reflects cost effectiveness. Financially, the investment shows positive results with a Net Present Value (NPV) of IDR. 220,346 and Profitability Index (PI) 1.009, indicating net profit. Although the payback point is reached in 23 years and 4 months, the project is financially viable and has the potential to provide long-term profits.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: PLTS, Kelayakan Investasi, Biaya perencanaan, Perumahan Duri Kosambi PLTS, Investment Feasibility, Planning Costs, Duri Kosambi Housing
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 05 Nov 2025 03:59
Last Modified: 05 Nov 2025 03:59
URI: https://repository.itpln.ac.id/id/eprint/3405

Actions (login required)

View Item
View Item