STUDI PEMANFAATAN PHOTOVOLTAIK (PV) PADA ATAP SEKOLAH MENENGAH KEJURUAN (SMK) NEGERI 4 JAKARTA SEBAGAI SUMBER PEMBANGKIT TENAGA SURYA KAPASITAS 51 kWp

Thamima, Robby Djohan and Qosim, Muchamad Nur (2024) STUDI PEMANFAATAN PHOTOVOLTAIK (PV) PADA ATAP SEKOLAH MENENGAH KEJURUAN (SMK) NEGERI 4 JAKARTA SEBAGAI SUMBER PEMBANGKIT TENAGA SURYA KAPASITAS 51 kWp. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 201811264 ROBBY DJOHAN THAMIMA.pdf] Text
SKRIPSI 201811264 ROBBY DJOHAN THAMIMA.pdf
Restricted to Registered users only

Download (3MB)

Abstract

Dalam Pembangkitan Listrik Tenaga Surya (PLTS) merupakan salah satu hal yang penting dimana dalam fungsinya sebagai energi alternatif terbarukan yang ada dan khususnya di Indonesia. Pada pemanfaatan atap sekolah dengan kapasitas 51 kWp dibutuhkan alat bantu berupa Software . Pada penelitian ini terdapat rumusan masalah yaitu, mencari volume atap gedung sekolah serta sudut kemiringan atap, berapa besar energi yang dipakai oleh sekolah perhari, menghitung berapa banyak unit PV yang akan dimanfaatkan pada atap sekolah, serta cost pembayaran terhadap pemakaian energi dan penghematan setelah pemakaian solar panel. Kemudian dari analisa dan perhitungan yang didapatkan, total PV yang akan dipasang berjumlah 206 unit dengan 102 string x 2 yang dipasang seri agar mendapatkan nilai arus maksimal. Kemudian digunakan baterai sebagai media penyimpan energi sebanyak 47 unit yang dipasang pararel dengan kapasitas 208 Ah dan di backup oleh PLN sebagai sumber listrik utama. Pada perhitungan PVSyst total energi yang dihemat sebesar 212.377 kWh/tahun serta penghematan cost sebesar Rp. 132.735.625 per tahun. Terdapat perhitungan tarif penjualan listrik sebesar Rp. 625/kWh. Data yang diambil merupakan data yang actual dan perlu dilakukan perbandingan dalam proses perhitungan secara langsung dilapangan. Pada system PLTS ini menggunakan system On – Grid dimana secara langsung energi yang dihasilkan dipakai pada saat penyinaran matahari. Hal ini dibantu oleh software PVSyst 7.2 dan dapat mengurangi margin eror pada pemasangan PV. Total investasi yang dikeluarkan selama proyek dijalankan dengan modal sebesar 2 milyar, diperoleh Payback Period selama 12 tahun

In Solar Power Generation (PLTS) is one of the important things in its function as an alternative renewable energy that exists and especially in Indonesia. In utilizing the school roof with a capacity of 51 kWp, software tools are needed. In this study, there is a formulation of the problem, namely, find the volume of the roof of the school building and the angle of the roof, how much energy is used by the school per day, calculate howmany PV units will be used on the roof of the school, as well as the cost of paying for energy consumption and savings after using solar panel. Then from the analysis and calculations obtained, the total PV to be installed is 206 units with 102 strings x 2 connected inseries to get the maximum current value. Then use batteries as energy storage media as many as 47 units installed in parallel with a capacity of 208 Ah and backed up by PLN asthe main source of electricity. In the PVSyst calculation, the total energy saved is 212,377 kWh/year and the cost savings is Rp. 132,735,625 per year. There is a calculation of electricity salesrates of Rp. 323/kWh. The data taken is actual data and comparisons need to be made in the calculation process directly in the field. In this PLTS system, it uses an On-Grid system where the energy produced is directly used when solar irradiation. This is assisted by the PVSyst 7.2 software and can reduce the margin of error in PV installations. A payback period of 12 years was obtained

Item Type: Thesis (Diploma)
Uncontrolled Keywords: PVSyst, Off- Grid PVSyst, Off- Grid
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 05 Nov 2025 04:26
Last Modified: 05 Nov 2025 04:26
URI: https://repository.itpln.ac.id/id/eprint/3419

Actions (login required)

View Item
View Item