ANALISIS PENYEBAB DAN AKIBAT VARIATION ORDER TERHADAP BIAYA PADA PROYEK EXTENTION COLD STORAGE BUILDING SUKANDA DJAYA MM2100

Budiman, Alya Fieryal and Kustanrika, Irma Wirantina (2022) ANALISIS PENYEBAB DAN AKIBAT VARIATION ORDER TERHADAP BIAYA PADA PROYEK EXTENTION COLD STORAGE BUILDING SUKANDA DJAYA MM2100. Diploma thesis, ITPLN.

[thumbnail of skripsi alyafieryalb_201821056.pdf] Text
skripsi alyafieryalb_201821056.pdf
Restricted to Repository staff only

Download (5MB)

Abstract

Pada proyek konstruksi akan dihadapkan dengan banyak permasalahan, salah satunya dikarenakan adanya variation order atau pekerjaan tambah kurang yang akan menghasilkan amandemen kontrak. Pada proyek Extention Cold Storage Building Sukanda Djaya MM2100 terdapat perubahan desain karena penyesuaian kondisi lapangan sehingga menyebabkan terjadinya variation order. Variation order akan mempengaruhi biaya proyek dan dapat merubah kontral awal. Pada penelitian ini menggunakan metode kuantitatif untuk mencari penyebab terjadinya variation order dengan menyebarkan kuesioner ke 7 orang pakar yang selanjutnya akan disebarkan ke 65 responden. Analisa data menggunakan software SPSS versi 26.0 dan Microsoft Excel. Untuk mendapatkan analisis perhitungan biaya menggunakan metode komperatif. Penelitian ini menunjukkan bahwa terdapat 3 faktor yang mempengaruhi terjadinya variation order pada proyek extention Cold Storage Building Sukanda Djaya MM2100, Cibitung yaitu faktor desain, faktor lapangan, dan faktor administrasi. Faktor dominan yang didapat pada penelitian ini adalah faktor desain.

In construction will be faces with many problems, one of them is variation order or less added work which will result in contract amandements. In the Extention Cold Storage Building Sukanda Djaya MM2100 project there is a design changed because there are adjustments to field conditions that cause variation orders. Variation order effects the cost project and can affected the initial contract agreement. This research using quantity methods for searching the causes of variation order using quisioner to collecting data from 5 experts people and will be distributed to 65 respondents. Data anlysis using software SPSS Verse 26.0 and Microsoft Excel. To get calculated anlysis costs using comperative methods. Ini this researchs indicated 3 factors can effects variation order in Extention Cold Storage Building Sukanda Djaya MM2100 project which is design factor, field factor and administration factor. The dominance factor in this research is design factor.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: variation order, faktor desain, faktor lapangan, faktor administrasi, biaya. casting, concrete defects, repair method
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 29 Aug 2025 02:42
Last Modified: 29 Aug 2025 02:42
URI: https://repository.itpln.ac.id/id/eprint/342

Actions (login required)

View Item
View Item