OPTIMALISASI PERALATAN PROTEKSI RECLOSERUNTUK MENDUKUNG KEANDALAANJARINGAN20KVPADA PT. PLN (PERSERO) UP3 JAYAPURA

Innamullah, Farizza Alifatul and Koerniawan, Tony (2024) OPTIMALISASI PERALATAN PROTEKSI RECLOSERUNTUK MENDUKUNG KEANDALAANJARINGAN20KVPADA PT. PLN (PERSERO) UP3 JAYAPURA. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 202211908 FARIZZA ALIFATUL INNAMULLAH.pdf] Text
SKRIPSI 202211908 FARIZZA ALIFATUL INNAMULLAH.pdf
Restricted to Registered users only

Download (7MB)

Abstract

Keandalan jaringan sangat penting untuk memastikan kontinuitas pelayananlistrikkepada pelanggan. Dalam menanggapi masalah ini, PLN berusaha mengurangigangguan yang dapat menyebabkan pemadaman listrik. Dengan wilayahkerjaUP3Jayapura memiliki kondisi geografis yang beragam dan panjang jaringan. Olehkarenaitu, fungsi recloser harus dioptimalkan. Beberapa fungsi recloser di UP3Jayapurabelum optimal. Adapun tujuan untuk penelitian ini yaitu memahami kerja peralatanRecloser yang ada serta optimaliasi peralatan recloser yang ada pada UP3Jayapura.Dalam penelitian ini menggunakan metode analisis data deskriptif. DalamPenentuanarus setting proteksi dipengaruhi oleh arus hubung singkat dan beban penyulang.Berdasarkan nilai perhitungan maka perlu dilakukan resetting pada PenyulangBougenville dengan nilai untuk kubikel penyulang OCR 277A dengan waktu0,03tmsdan GFR 30A dengan waktu 0,03 tms, Serta untuk Recloser OCR 173 Adenganwaktu0,01 tms dan GFR 20 A dengan waktu 0,01 tms. Untuk peningkatan kinerja peralatanproteksi recloser existing pada UP3 Jayapura perlu dilakukan resetting yanglebihselektif dalam melokalisir gangguan yang terjadi pada Penyulang Bougenvile agar lebihoptimal dan berdampak pada peningkatan keandalan jaringan. Optimalisasi recloserdengan relokasi recloser otogeisler ke recloser ramayana pada Penyulang Bougenvilesudah dilakukan pada tahun 2023, adapun hasil optimalisasi terjadi penurunankaligangguan dari tahun 2023 sebesar 15 kali gangguan menjadi 1 kali gangguanpadatahun 2024

Network reliability is crucial to ensure the continuity of electricity service tocustomers.In response to this issue, PLN strives to reduce disturbances that can causepoweroutages. The working area of UP3 Jayapura has diverse geographical conditionsandalong network. Therefore, the function of the recloser must be optimized. Somerecloserfunctions in UP3 Jayapura are not yet optimal. The purpose of this researchistounderstand the performance of existing recloser equipment and to optimize therecloserequipment at UP3 Jayapura. This research uses descriptive data analysis methods. Thedetermination of protection setting currents is influenced by short-circuit currentsandfeeder loads. Based on the calculated values, resetting is necessary for the BougenvilleFeeder with values for the feeder cubicle OCR 277A with a time of 0.03 tms andGFR30A with a time of 0.03 tms, and for the Recloser OCR 173A with a time of 0.01tmsandGFR 20A with a time of 0.01 tms. To improve the performance of existingrecloserprotection equipment at UP3 Jayapura, more selective resetting is neededtolocalizedisturbances occurring on the Bougenville Feeder to be more optimal andimpact theimprovement of network reliability. The optimization of the recloser by relocatingtheotogeisler recloser to the ramayana recloser on the Bougenville Feeder was carriedoutin 2023, resulting in a decrease in disturbances from 15 times in 2023 to 1 timein2024

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Recloser, Optimalisasi Peratan Proteksi, Arus Hubung Singkat, SettingProteksi Recloser, Protection Equipment Optimization, Short-Circuit Current,Protection Setting
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 05 Nov 2025 06:57
Last Modified: 05 Nov 2025 06:57
URI: https://repository.itpln.ac.id/id/eprint/3431

Actions (login required)

View Item
View Item