Sitio, Julio Resmando and Fernandes, Alex (2024) ANALISIS PENERAPAN SKEMA PROTEKSI HYBRIDPOTT ECHO (WEAK INFEED+Z4 REVERSE) PADARELAY DISTANCE GE D60 UNTUKBAYPENGHANTAR150 KV BNGKO#1 DI GI SUNGAI PENUH. Diploma thesis, ITPLN.
SKRIPSI 202211543 JULIO RESMANDO SITIO.pdf
Restricted to Registered users only
Download (5MB)
Abstract
Dalam Sistem Transmsisi, sistem proteksi menjadi aspek yang sangat penting dalammenjaga keandalandan keamanan operasi jaringan transmisi listrik. Salah satu tantangan yang dihadapi adalah kondisi weakinfeed di gardu induk yang menyebabkan relay menjadi tidak sensitif dalam mengeliminasi gangguan. Kondisi weak infeed di Gardu Induk Sungai Penuh disebabkan oleh sistem saluran transmisi sirkit tunggal BNGKO-SPNUH #1 dan Gardu Induk Sungai Penuh merupakan Gardu Induk Ujung. Kondisi ini menyebabkan trip satu sisi di GI bangko pada saat terjadi gangguan di segmen BNGKO-SPNUH#1sehingga dapat memperpanjang durasi gangguan. Durasi gangguan yang panjang tentunya dapat menyebabkan kerugian yang diakibatkan daya yang tidak tersalurkan pada konsumen. Untukituditerapkan skema proteksi Hybrid POTT Echo (Weak Infeed + Z4 Reverse) untuk mengatasi permasalahan ini. Penelitian ini berfokus pada analisis penerapan skema proteksi Hybrid POTTEcho(Weak Infeed + Z4 Reverse) pada relay distance GE D60 untuk bay penghantar 150 kVBNGKO#1di GISungai Penuh. Penelitian ini menggunakan metode penelitian pengumpulan data dan metode penelitiananalisa data dalam pelaksanaanya. Penelitian ini menggunakan metode penelitian pengumpulandatadanmetode penelitian analisa data dalam pelaksanaanya.
In transmission systems, protection systems are crucial in maintaining the reliability and safetyofelectrical transmission network operations. One of the challenges faced is the weak infeed conditionat substations, which causes relays to become insensitive in eliminating faults. The weak infeed conditionat the Sungai Penuh Substation is caused by the single-circuit transmission line BNGKOSPNUH#1, andtheSungai Penuh Substation is an end-of-line substation. This condition leads to a one-sided tripat theBangko Substation when a fault occurs in the BNGKO-SPNUH#1 segment, potentially extendingthefault duration. Prolonged fault durations can result in losses due to untransmitted power to consumers. Toaddress this issue, a Hybrid POTT Echo (Weak Infeed + Z4 Reverse) protection scheme has beenimplemented. This study focuses on analyzing the application of the Hybrid POTT Echo (WeakInfeed+Z4 Reverse) protection scheme on the GE D60 distance relay for the 150 kV BNGKO#1 feeder at theSungai Penuh Substation. The main objective of this study is to evaluate the effectiveness of the HybridPOTT Echo protection scheme in detecting and responding to faults in the transmission network. Thisresearch uses data collection research methods and data analysis research methods in its implementation. This research uses data collection research methods and data analysis research methods initsimplementation.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Weak Infeed, skema proteksi, Hybrid POTT, AutoReclose Weak Infeed, Protection scheme, Hybrid POTT, AutoReclose |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 06 Nov 2025 03:25 |
| Last Modified: | 06 Nov 2025 03:25 |
| URI: | https://repository.itpln.ac.id/id/eprint/3471 |