Toni, Marzouq Algah and Pahiyanti, Novi Gusti (2024) ANALISA PENGGUNAAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) DENGAN SISTEM OFF GRID SEBAGAI CATU DAYA PADA BASE TRANSCEIVER STATION (BTS) DI SITE CAMAR BULAN KALIMANTAN BARAT. Diploma thesis, ITPLN.
SKRIPSI 202211520 MARZOUQ ALGAH TONI.pdf
Restricted to Registered users only
Download (3MB)
Abstract
Bidang teknologi industri telekomunikasi berkembang sangat pesat di Indonesia, Dalam memenuhi keperluan jaringan dilaksanakannya dengan membangun sebuah infrastruktur jaringan yaitu Tower BTS. dalam pembangunan BTS 4G di kawasan 3T (Terluar, Terdepan, Tertinggal) dengan pemanfaatan energi terbarukan dari Pembangkit Listrik Tenaga Surya tanpa adanya aliran listrik dari PLN.Tower BTS camar bulan berdiri sejak November 2018, dengan adanya penambahan perangkat 4G yang awalnya hanya 2G & 3G maka perlunya dilakukan analisa kelistrikannya, penelitian ini bertujuan untuk mengetahui kondisi kelistrikan exsiting masih layak untuk mencatu daya Tower BTS camar bulan dari jumlah dan kapasitas dari komponen modul surya, baterai, dan SCC, dengan kondisi kelistrikan exsiting Solar Panel canadian CS6U -320P jumlah 14 buah (320 Wp) total daya 4480 Wp, SCC MPPT Outback FLEXmax FM60 2 buah 60 A, baterai NAGOYA VRLA OPzV2-1000 Kapasitas 1000 Ah jumlah 24 buah. Sesuai perhitungan penelitian kebutuhan beban pada Mei 2024 Solar Panel canadian CS6U -320P jumlah 10 buah, (320 Wp) total daya 3200 Wp dengan perhitungan energi total beban harian sebesar 9.385,4 Wh/hari, SCC MPPT Outback FLEXmax FM60 1 buah 60 A dengan total arus 46,3 A, baterai NAGOYA VRLA OPzV2-700 Kapasitas sebesar 700 Ah jumlah 24 buah. Jadi kondisi kelistrikan exsiting layak dengan penambahan perangkat.
The technology sector of the telecommunications industry is developing very rapidly in Indonesia. To meet network needs, this is done by building a network infrastructure, namely the BTS Tower. in the construction of 4G BTS in 3T (Outermost, Frontier, Disadvantaged) areas by utilizing renewable energy from Solar Power Plants without any electricity from PLN. The Seagull Moon BTS Tower was established in November 2018, with the addition of 4G devices which were initially only 2G & 3G So it is necessary to carry out an electrical analysis, this research aims to determine whether the exsiting electrical condition is still suitable for supplying power to the Moon Seagull BTS Tower from the number and capacity of the solar module components, batteries and SCC, with the exsiting electrical condition of the Canadian CS6U -320P Solar Panels totaling 14 units. (320 Wp) total power 4480 Wp, SCC MPPT Outback FLEXmax FM60 2 pieces 60 A, NAGOYA VRLA OPzV2-1000 battery Capacity 1000 Ah, quantity 24 pieces. According to research calculations of load requirements in May 2024, the number of Canadian CS6U -320P Solar Panels is 10 units, (320 Wp) total power 3200 Wp with a total daily load energy calculation of 9,385.4 Wh/day, SCC MPPT Outback FLEXmax FM60 1 unit 60 A with total current 46.3 A, NAGOYA VRLA OPzV2-700 battery capacity 700 Ah, 24 units. So the existing electrical conditions are feasible with the addition of devices.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | BTS, PLTS, catu daya BTS, PLTS, power supply |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 06 Nov 2025 04:11 |
| Last Modified: | 06 Nov 2025 04:11 |
| URI: | https://repository.itpln.ac.id/id/eprint/3493 |