RANCANG BANGUN LEVEL TRANSMITTER UNTUK MONITORING LEVEL KOLAM SECARA REAL TIME DI PT PGE AREA LAHENDONG

Cahyadi, Dede and senen, adri (2024) RANCANG BANGUN LEVEL TRANSMITTER UNTUK MONITORING LEVEL KOLAM SECARA REAL TIME DI PT PGE AREA LAHENDONG. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI 202111242 DEDE CAHYADI.pdf] Text
SKRIPSI 202111242 DEDE CAHYADI.pdf
Restricted to Registered users only

Download (8MB)

Abstract

PT Pertamina Geothermal Energy Area Lahendong merupakan salah satu area yang mengembangkan bisnis panas bumi dengan kapasitas terpasang 120 MW. 120 MW tersebut terdiri dari PLTP Unit 1-4 dimiliki oleh PT PLN (IP) dan PLTP Unit 5&6 dimiliki oleh PT PGE. Energy Panas Bumi/Geothermal Energy di Lahendong mempunyai sifat 2 fasa yaitu steam dan brine, dimana steam (uap) akan digunakan untuk pembangitan sedangkan brine (air panas) akan dimasukan kembali ke dalam bumi. Di Lahendong untuk brine akan ditampung dulu di Pond/kolam, kemudian direinjeksikan ke sumur reinjeksi menggunakan pompa reinjeksi. Dalam hal ini, operator melakukan pengecekan visual ke kolam untuk memastikan apakah ketinggian brine sudah tinggi atau rendah, kemudian waktu yang dibutuhkan operator bertambah, dan strategi pengursan brine menjadi tidak efektif, serta adanya potensi brine akan meluap ke sungai, dimana brine termasuk limbah dari bisnis panas bumi. Oleh karena itu, penulis mencoba membuat sistem alat ukur level transmitter kolam brine yang mempunyai akurasi tinggi dan real time bisa terbaca di DCS. Maka penulis mengajukan penelitian dengan judul “RANCANG BANGUN LEVEL TRANSMITTER UNTUK MONITORING LEVEL KOLAM SECARA REAL TIME DI PT PGE AREA LAHENDONG”.

PT Pertamina Geothermal Energy Area Lahendong is one of the areas developing geothermal business with an installed capacity of 120 MW. This 120 MW consists of PLTP Unit 1-4 owned by PT PLN (IP) and PLTP Unit 5&6 owned by PT PGE. Geothermal energy in Lahendong has a two-phase nature, namely steam and brine, where steam is used for power generation, while brine (hot water) is reinjected back into the earth. In Lahendong, brine is first collected in a pond, then reinjected into the reinjection wells using reinjection pumps. In this case, operators perform visual checks of the pond to ensure whether the brine level is high or low, which increases the time required by the operator and makes brine management strategies ineffective. There is also the potential for brine to overflow into the river, where brine is considered waste from geothermal business. Therefore, the author aims to create a brine pond level transmitter system with high accuracy that can be read in real-time in the DCS. Thus, the author proposes a study entitled “DESIGN AND CONSTRUCTION OF LEVEL TRANSMITTER FOR REAL-TIME MONITORING OF POOL LEVEL AT PT PGE LAHENDONG AREA”.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Brine, Transmitter, akurasi tinggi, Real Time Brine, Transmitter, high accuracy, Real Time
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 06 Nov 2025 06:29
Last Modified: 06 Nov 2025 06:29
URI: https://repository.itpln.ac.id/id/eprint/3523

Actions (login required)

View Item
View Item