ANALISA KOORDINASI RELE ARUS LEBIH DAN RELE GANGGUAN TANAH PADA SISTEM PROTEKSI DI PENYULANG ADIK 20 KV GARDU INDUK GANDUL AREA CIPUTAT

Putra A, Nyoman Kanadatantra and Hariyanto, Agung (2018) ANALISA KOORDINASI RELE ARUS LEBIH DAN RELE GANGGUAN TANAH PADA SISTEM PROTEKSI DI PENYULANG ADIK 20 KV GARDU INDUK GANDUL AREA CIPUTAT. Diploma thesis, ITPLN.

[thumbnail of Nyoman Kanadatantra PA.pdf] Text
Nyoman Kanadatantra PA.pdf
Restricted to Registered users only

Download (2MB)

Abstract

Peningkatan kualitas pelayanan PT. PLN (Persero) harus semakin baik seiring bertambahnya waktu agar pelanggan atau konsumen dapat terpuaskan. Namun kenyataannya pada sistem tenaga listrik bisa terjadi gangguan yang menyebabkan penyaluran tenaga listrik padam sebagian atau total. Seringnya terjadi gangguan listrik pada jaringan distribusi itu dikarenakan kurang andalnya sistem pengaman, kepekaan dalam sistem pengamanan, selektifitas dan kecepatan dalam pengamanan. Kecepatan dan kepekaan peralatan sistem proteksi dalam mengatasi gangguan dapat diatur dari setting proteksi GFR dan OCR pada CBO yang digunakan untuk bekerja mengirimkan sinyal terhadap PMT untuk memutuskan jaringan. Pada skripsi ini akan dibahas tentang koordinasi dan setting perhitungan relai yang ada di CBO maupun penyulang Adik di Area Ciputat. Dari penyetelan didapat bahwa relai hasil setting perhitungan memliki perbedaan dengan hasil setting lapangan. Dari hasil perhitungan data di atas didapat nilai setting waktu relai pada sisi incoming penyulang adalah 0,97 dengan nilai TMS adalah 0,27 dan pada sisi outgoing penyulang adalah 0,61 detik dengan nilai TMS adalah 0,39. Sedangkan pada pada sisi kubikel CBO didapat setting waktu rele adalah 0,3 detik dengan TMS 0,18. Nilai tersebut membuktikan kerja rele pada kubikel CBO lebih cepat dari kerja relai outgoing dan incoming penyulang.

Improved service quality of PT. PLN (Persero) should get better as time increases so that customers or consumers can be satisfied. However, the reality of the electrical power system can occur interference that causes the distribution of power outages in part or total. Frequent electrical disturbances in the distribution network due to less reliable security systems, sensitivity in the security system, selectivity and speed in security. The speed and sensitivity of the protection system equipment in overcoming the disturbance can be set from the GFR and OCR protection settings on the CBO used to work to send a signal to the PMT to disconnect the network. In this thesis will be discussed about the coordination and setting of relay calculations in the CBO as well as repeater sister in Ciputat Area. From the settings obtained that the relay result of the calculation settings have differences with the result of the field setting. From the above data calculation results obtained value relay time setting on the incoming side of the repeater is 0.97 with the value of TMS is 0.27 and on the outgoing side of the repeater is 0.61 seconds with the value of TMS is 0.39. While on the side of cubicle CBO obtained setting time relay is 0.3 seconds with TMS 0.18. This value proves the relay work on CBO cubicles faster than the work of outgoing relays and incoming feeders.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Distribusi, Proteksi, CBO Distribution, Protection, CBO
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 07 Nov 2025 03:27
Last Modified: 07 Nov 2025 03:27
URI: https://repository.itpln.ac.id/id/eprint/3569