KAJIAN PENERAPAN ISLANDING OPERATION DI SUB SISTEMUNGARAN-KESUGIHAN

Anindya, Bella Vertika and Hariyanto, Agung (2018) KAJIAN PENERAPAN ISLANDING OPERATION DI SUB SISTEMUNGARAN-KESUGIHAN. Diploma thesis, ITPLN.

[thumbnail of BELLA 201411299.pdf] Text
BELLA 201411299.pdf
Restricted to Registered users only

Download (4MB)

Abstract

Ketidakseimbangan antara pasokan daya pembangkit dan kebutuhan beban akan menimbulkan pergeseran nilai frekuensi sistem dari nilai nominalnya (50 Hz). Jika terjadi ketidakseimbangan frekuensi yang cukup besar, misalnya trip unit pembangkit kapasitas besar atau tripnya IBT secara tiba-tiba akan menyebabkan frekuensi sistem turun dengan cepat. Penurunan frekuensi bisa mencapai titik yang kritis, diluar batas toleransi yang diizinkan. Jika penurunan frekuensi yang kritis tersebut tidak segera diantisipasi maka akan menyebabkan unit-unit pembangkit lain yang masih beroperasi ikut terlepas (trip) dari sistem, dan akibat terburuknya adalah pemadaman beban total (Black Out). Salah satu upaya yang akan ditempuh untuk mengatasi kondisi seperti tersebut adalah pemisahan sistem (Islanding). Skema Operasi terpisah (Islanding Operation Scheme) adalah skema pengamanan sistemdimana unit-unit pembangkit yang saling interkoneksi dipisahkan secara otomatis untuk beroperasi sendiri atau bersama unit lain dalam wilayah yang lebih kecil dengan memikul beban sesuai kemampuan unit pembangkitnya. Dalam skripsi ini dibahas mengenai perancangan skema island operation pada subsistem Ungaran- Kesugihan dengan simulasi gangguan 3 IBT trip. Pada skema island ini dilakukan pelepasan beban sebanyak 4 tahap agar dapat mengakomodir kondisi subsistemselama 24 jam dengan menggunakan relai df/dt (Rate of Change of Frequency Relay)

The imbalance between the power supply and the load requirements will cause a shift in the system frequency value from its nominal value (50 Hz). In the event of a large enough frequency imbalance, such as a large capacity generator trip or a trip IBT will suddenly cause the system frequency to drop rapidly. The decrease in frequency can reach a critical point, beyond the allowed tolerable limits. If the critical drop in frequency is not immediately anticipated it will cause other units of the operating plant to be tripped from the system, and the worst result is a blackout outage. One effort that will be taken to overcome such conditions is the separation of the system (Islanding). The Islanding Operation Scheme is a system security scheme in which interconnecting generating units are automatically separated to operate on their own or with other units in a smaller area by carrying the load in the capacity of the generating unit. In this thesis discussed about the design of island operation scheme on Ungaran-Kesugihan subsystem with simulation of 3 IBT trip interruption. In this island scheme, there are 4 stages of load release in order to accommodate subsystem condition for 24 hours using df / dt relay (Rate of Change of Frequency Relay).

Item Type: Thesis (Diploma)
Uncontrolled Keywords: frekuensi, beban, pembangkit, trip, island operation frequency, load, generator, trip, island operation
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 07 Nov 2025 04:06
Last Modified: 07 Nov 2025 04:06
URI: https://repository.itpln.ac.id/id/eprint/3580