Baskoro, Bagus Tejo and Willy, Purnomo (2019) KOORDINASI SETTING PROTEKSI OCR DAN GFR PADA PENYULANG PUMA 20 KV PT PLN (PERSERO) AREA BINTARO. Diploma thesis, ITPLN.
Skripsi.pdf
Restricted to Registered users only
Download (2MB)
Abstract
Peningkatan kualitas pelayanan PT. PLN (Persero) harus semakin baik seiring bertambahnya waktu agar pelanggan atau konsumen dapat terpuaskan. Namun kenyataannya pada sistem tenaga listrik bisa terjadi gangguan yang menyebabkan penyaluran tenaga listrik padam sebagian atau total. Seringnya terjadi gangguan listrik pada jaringan distribusi itu dikarenakan kurang andalnya sistem pengaman, kepekaan dalam sistem pengamanan, selektifitas dan kecepatan dalam pengamanan. Kecepatan dan kepekaan peralatan sistem proteksi dalam mengatasi gangguan dapat diatur dari setting proteksi OCR dan GFR. Pada skripsi ini akan dibahas tentang koordinasi dan setting perhitungan relai yang ada di penyulang Puma di Area Bintaro. Dari penyetelan didapat bahwa relai hasil setting perhitungan memliki perbedaan dengan hasil setting lapangan. Dari hasil perhitungan data di atas didapat nilai setting waktu relai pada sisi incoming penyulang adalah 0,93 dengan nilai TMS adalah 0,26 dan pada sisi outgoing penyulang adalah 0,29 detik dengan nilai TMS adalah 0,19. Nilai tersebut membuktikan kerja rele pada relai outgoing lebih cepat dari kerja incoming penyulang.
Improving the quality of service of PT. PLN (Persero) is a must for customers or consumers satisfaction. In fact, the power system can be interrupted which causes a partial or total outage of electricity. Frequent electrical disturbances occur in the distribution network because of the lack of reliability of the security system, sensitivity in the security system, selectivity and speed in security. The speed and sensitivity of the protection system in dealing with interference can be set from the OCR and GFR protection settings. In this case, we will discuss about coordination and calculation of relay calculations at Puma Distributors in Bintaro Area. Relay results from the settings obtained show the differences between calculation settings and real field settings. The value from the calculation of the relay time setting on the incoming feeder side is 0.93 with the TMS value being 0.26 and the outgoing side of the feeder is 0.29 seconds with the TMS value being 0.19. This value proves that relay work in outgoing relays is faster than incoming work.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Distribusi, proteksi, OCR (over current relay), GFR (ground fault relay) Distribution, protection, OCR (over current relay), GFR (ground fault relay) |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 10 Nov 2025 04:35 |
| Last Modified: | 10 Nov 2025 04:35 |
| URI: | https://repository.itpln.ac.id/id/eprint/3636 |