Nagara, M. Ardi and Sepriyanna, Irma (2022) ANALISIS FAKTOR RISIKO PENYEBAB KETERLAMBATAN PADA PROYEK GEDUNG PELAYANAN KANKER RSUP FATMAWATI, CILANDAK, DKI JAKARTA. Diploma thesis, ITPLN.
![[thumbnail of M. ARDI NAGARA_201821044_SKRIPSI.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
M. ARDI NAGARA_201821044_SKRIPSI.pdf
Restricted to Repository staff only
Download (2MB)
Abstract
Risiko adalah hal-hal yang mungkin terjadi secara alami atau kemungkinan terjadinya peristiwa yang tidak diharapkan merupakan ancaman pada proyek kontruksi pada pelaksanaan pembangunan bunker Proyek Gedung Pelayanan Kanker Terpadu RSUP Fatmawati terjadi keterlambatan. Tujuan dari penelitian ini adalah untuk mengidentifikasi faktor risiko yang berpengaruh terhadap kinerja waktu, penyebab dan dampak dari risiko dominan serta tindakan dan respon apa yang diterapkan untuk faktor-faktor risiko tersebut agar meminimalisir terjadinya keterlambatan. Pada penelitian ini digunakan metode kuantitatif deskriptif dimana pengumpulan data dilakukan dengan cara survey melalui kuesioner dan divalidasi oleh para pakar untuk penentuan variabel, penyebaran kuesioner, pengujian validitas dan reabilitas dengan SPSS v.26, analisa uji peringkat dan level risiko dengan Ms. Excel serta wawancara kepada responden untuk analisa tindak lanjut. Hasil penelitian menunjukkan terdapat 5 jenis faktor risiko yang dominan yang memiliki kategori tinggi sampai sedang yaitu X17 kekurangan tenaga kerja, X12 Perubahan jadwal pelaksanaan pekerjaan, X2 Kesalahan desain oleh perencana, X27 Keterlambatan proses pembayaran oleh owner, dan X26 Ketersediaan keuangan selama pelaksanaan.
Risks are things that may occur naturally or the possibility of unexpected events is a threat to the construction project in the implementation of the bunker construction of the Integrated Cancer Service Building Project of RSUP Fatmawati there is a delay. The purpose of this study is to identify risk factors that affect the timing performance, causes and impacts of the dominant risk and what actions and responses are applied to these risk factors in order to minimize the occurrence of delays. In this study, a descriptive quantitative method was used where data collection was carried out by means of a survey through questionnaires and validated by experts for variable determination, questionnaire distribution, validity and reliability testing with SPSS v.26, analysis of rating tests and risk levels with Ms. Excel and interviews with respondents for follow-up analysis. The results showed that there are 5 types of dominant risk factors that have a high to moderate category, namely X17 lack of manpower, X12 Changes in work implementation schedules, X2 Design errors by planners, X27 Delays in the payment process by the owner, and X26 Financial availability during implementation.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Faktor, Risiko, Keterlambatan, SPSS v.26 Factors, Risks, Delays, SPSS v.26 |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 29 Aug 2025 06:41 |
Last Modified: | 29 Aug 2025 06:41 |
URI: | https://repository.itpln.ac.id/id/eprint/364 |