ANALISIS GANGGUAN HUBUNG SINGKAT PADA SISTEM TENAGA LISTRIK DI PERTAMINA REFENERY UNIT IV CILACAP

Rizayunizar, Rizayunizar and Isworo, lakso (2018) ANALISIS GANGGUAN HUBUNG SINGKAT PADA SISTEM TENAGA LISTRIK DI PERTAMINA REFENERY UNIT IV CILACAP. Diploma thesis, ITPLN.

[thumbnail of Analisis gangguan hubung singkat pada sistem tenaga listrik pt pertamina ru iv cilacap.pdf] Text
Analisis gangguan hubung singkat pada sistem tenaga listrik pt pertamina ru iv cilacap.pdf
Restricted to Registered users only

Download (4MB)

Abstract

PT. Pertamina RU IV Cilacap merupakan unit pengolahan kilang minyak terbesar yang dimiliki oleh PT. Pertamina. Untuk memenuhi kebutuhan daya listrik yang menunjang kegiatan produksi kilang, PT. Pertamina RU IV Cilacap mengoperasikan pembangkit listrik dengan delapan generator dimana empat berkapasitas 24 MW dan empat generator lainya 80 MW. Pada sistem tenaga listrik sering terjadi masalah gangguan hubung singkat. Pada Pertamina RU IV cilacap sering terjadi beberapa gangguan di antaranya gangguan hubung singkat khusunya pada substasion-substasion yang ada pada daerah kilang minyak. Terjadinya gangguan pada substasion tersebut dikarenakan akibat kerusakan pada isolasi kabel, kerusakan isolasi winding motor,komponenkomponen yang kotor atau sudah tidak layak pakai serta terminasi yang kendur. Pada analisis gangguan hubung singkat pada pertamina RU IV cilacap dengan menggunakan program ETAP 12.6 dan perhitungan manual didapatkan nilai gangguan arus terbesar sebesar 38,29736 kA dan terkecil sebesar 0,397 kA. Berdasarkan analisa gangguan hubung singkat pada pertamina RU IV cilacap didapatkan hasil bahwa rating CB sebesar 65 kA masih dapat menahan besarnya arus gangguan terbesar.

PT. Pertamina RU IV Cilacap is the largest refinery processing unit owned by PT. Pertamina. To meet the electricity needs that support refinery production activities, PT. Pertamina RU IV Cilacap operates a power plant with eight generators where four have a capacity of 24 MW and four other generators are 80 MW. In the electric power system, short circuit problems often occur. At Pertamina RU IV Cilacap there are often some disturbances, including short circuit disturbances, especially in substations in the oil refinery area. The occurrence of interference on the substation is due damage to the cable insulation, damage to the insulation of the winding motor, components that are dirty or not suitable for use and loose termination. In the analysis of short circuit disturbance at pertamina RU IV cilacap using ETAP 12.6 program and manual calculation obtained the value of the largest current disturbance is 38,29736 kA and the smallest is 0,397 kA. Based on the analysis of the short circuit disturbance at Pertamina RU IV Cilacap, the result shows that the CB rating of 65 kA can still withstand the largest current of interference..

Item Type: Thesis (Diploma)
Uncontrolled Keywords: PT.Pertamina RU IV cilacap, Hubung singkat, ETAP 12.6, Busbar PT.Pertamina RU IV cilacap, Short circuit, ETAP 12.6, Busbar
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 10 Nov 2025 04:43
Last Modified: 10 Nov 2025 04:43
URI: https://repository.itpln.ac.id/id/eprint/3641

Actions (login required)

View Item
View Item