Sitohang, Pahala Geraldo Tua and Yogianto, Aloysius Agus (2018) SEKOLAH TINGGI TEKNIK-PLN ANALISIS PRODUKSI ENERGI LISTRIK PLTS 600 KWP GILI TRAWANGAN. Diploma thesis, ITPLN.
SKRIPSI ANALISIS PRODUKSI PLTS 600 KWP GILI TRAWANGAN .pdf
Restricted to Registered users only
Download (17MB)
Abstract
Pengembangan energi terbarukan khususnya PLTS perlu dioptimalkan di Indonesia karena geografis indonesia memiliki potensi energi matahari yang besar. Hal penting yang harus diperhatikan dalam pengembangan PLTS adalah produksi energi PLTS. Untuk menganalisa produksi energi PLTS Gili Trawangan dilakukan perhitungan potensi energi array, energi keluaran array, efisiensi produksi array, suhu array, efisiensi produksi inverter, dan keluaran inverter. Dari hasil perhitungan, total potensi masing – masing array G1, array G2, dan array G3 adalah 2.881.957,96 kWh, 2.412.659 kWh, dan 1.787.100,7 kWh. Produksi energi tertinggi masing – masing array terjadi pada bulan Oktober 2017 yaitu 40.910,8 kWh, 35.707,9 kWh dan 25.661,8 kWh. Efisiensi rata – rata masing – masing array G1, array G2 dan array G3 adalah 13,83%, 14,75%, dan 14,25 %. Produksi energi tertinggi masing – masing inverter adalah 30.245,3 kWh, 26.600,1 kWh dan 24.661,7 kWh. Efisiensi rata – rata inverter G1, inverter G2 dan inverter G3 adalah 73,80 %, 73,55 %, dan 96,06 %. Rata – rata suhu array G1, array G2 dan array G3 adalah 38,86 ºC, 36,34 ºC, dan 33,725 ºC.
The renewable energy development especially solar power plant is important to optimize in Indonesia, because Indonesia geographical has a big potential of solar energy. The important thing in the development of solar power plant is electric energy production. To analyze energy production of Gili Trawangan solar power plant is conducted calculation of array efficiency, array output energy, solar energy potential, array tempetature, inverter efficiency and inverter output energy. The result of calculations, total potential energy of each array is 2.881.957,96 kWh, 2.412.659 kWh, dan 1.787.100,7 kWh. Highest production energy of each array Gili Trawangan solar power plant occurs on October 2017 is 40.910,8 kWh, 35.707,9 kWh and 25.661,8 kWh. Efficiency average of each array G1, array G2, array G3 is 13,83%, 14,75%, dan 14,25 %. Highest production energy of each inverter is 30.245,3 kWh, 26.600,1 kWh and 24.661,7 kWh. Efficiency average of inverter G1, inverter G2, and inverter G3 is 73,80 %, 73,55 %, dan 96,06 %. Temperature average of array G1, array G2, and array G3 is 38,86 ºC, 36,34 ºC, dan 33,725 ºC.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | PLTS, produksi energi, efisiensi, suhu. solar power plant, production energy, efficiency, temperature. |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 10 Nov 2025 06:42 |
| Last Modified: | 10 Nov 2025 06:42 |
| URI: | https://repository.itpln.ac.id/id/eprint/3652 |
