Suteja, Rai Pramesti and Willy, Purnomo (2018) STUDI PERENCANAAN PERBAIKAN TEGANGAN PADA JARINGAN TEGANGAN MENENGAH PENYULANG BANYUWEDANG DAN KALANG ANYAR DI SISTEM BALI UTARA. Diploma thesis, ITPLN.
RAI PRAMESTI SUTEJA.pdf
Restricted to Registered users only
Download (7MB)
Abstract
Di dalam operasi sistem distribusi nilai tegangan di setiap titik saluran harus memenuhi standar mutu tegangan yaitu dimana tegangan (V) operasi besarnya dibatasi 0.9 Vnom ≤ V operasi ≤ 1.05 Vnom (atau +5% dan -10% Vnom) sesuai dengan SPLN No 01 Tahun 1995 yaitu + 5% dan -10 % dari tegangan nominal. Pada penyulang Banyuwedang dan Kalanganyar yang berada di Kabupaten Buleleng Provinsi Bali memiliki tegangan jauh di bawah standar. Penyulang Banyuwedang pada GI Gilimanuk memiliki tegangan ujung sebesar 17,706 kV. Sedangkan penyulang Kalanganyar di GI Pemaron memiliki tegangan ujung sebesar 18,178 kV. Dikarenakan terjadi jatuh tegangan sehingga perlu adanya perbaikan. Dalam pembahasan skripsi ini digunakan 2 tahapan perbaikan tegangan yaitu menggunakan penambahan GIS Celukan Bawang serta rekonfigurasi jaringan menggunakan aplikasi ETAP 12.6.0. Tegangan ujung pada penyulang Banyuwedang menjadi 19,295 kV, dengan presentase perbaikan sebesar 8,31%. Tegangan ujung penyulang Kalang Anyar menjadi 19,295 % dengan persentase perbaikan sebesar 5,94%.
To operate distribution system,the voltage level in each every point must meet with the quality standard of voltage (grid code of distribution) where the voltage level limited to 0.9 Vnom ≤ V operation ≤ 1.05 Vnom (or +5% and -10% Vnom).This Standard used according to SPLN No.1 Year 1995 .Banyuwedang and Kalanganyar distribution feeder located at Buleleng district Bali province have a voltage below the standard of grid code of distribution.Voltage level at the end of Banyuwedang feeder distribution in Gilimanuk substation is 17,706 kV.Beside that voltage level at the end of Kalanganyar feeder distribution is 18,178 kV.This voltage drop need to improve according to standard set.In this study there will be 2 methods to improve the voltage drop.First method is added Celukan Bawang Gas Insulated Substation (GIS) and the second method is network reconfiguration.In this study will be analyze with Software ETAP 12.6.0.Voltage level at the end Banyuwedang feeder become 19,295 kV,with improvement percentage 8,31%,Voltage level at the end Kalanganyar feeder become 19,295 kV with improvement percentage 5,94%.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Jaringan Tegangan Menengah, Perbaikan Tegangan Penyulang Banyuwedang dan Kalang Anyar Medium Voltage Network, Improvement voltage on Banyuwedang and Kalang Anyar feeder |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 10 Nov 2025 06:49 |
| Last Modified: | 10 Nov 2025 06:49 |