Damanik, Japarista Tambah Tuah and Sirait, Rummi (2025) ANALISIS SISTEM PROTEKSI ARUS LEBIH MENGGUNAKAN OVER CURRENT RELAY PADA TRANSFORMATOR DAYA 60 MVA GIS KOTA TIMUR 70 KV PALEMBANG. Diploma thesis, Institut Teknologi PLN.
SKRIPSI 202011255 JAPARISTA TAMBAH TUAH DAMANIK.pdf
Restricted to Registered users only
Download (5MB)
Abstract
Penelitian ini bertujuan untuk menganalisis kinerja sistem proteksi arus lebih menggunakan Over Current Relay (OCR) pada transformator daya 60 MVA di Gardu Induk Kota Timur 70 kV Palembang. Sistem proteksi ini dirancang untuk mendeteksi dan mengisolasi gangguan arus lebih yang dapat menyebabkan kerusakan pada peralatan listrik. Metode penelitian meliputi pengumpulan data, perhitungan arus nominal, arus gangguan, dan pengaturan OCR, serta simulasi menggunakan software ETAP. Hasil penelitian menunjukkan bahwa OCR berhasil mendeteksi gangguan arus lebih dengan waktu kerja yang sesuai dengan karakteristik standar invers. Pada kondisi base load, waktu kerja relay adalah 0,437 detik untuk arus gangguan 5,693 kA, sedangkan pada kondisi peak load, waktu kerja relay lebih cepat yaitu 0,418 detik untuk arus gangguan 5,834 kA Dimana penelitian OCR berfungsi memproteksi peralatan listrik terhadap arus lebih Arus lebih dapat disebabkan oleh gangguan arus hubung singkat. OCR akan mendeteksi arus lebih dan memberikan sinyal untuk memutuskan aliran listrik, sehingga dapat mencegah kerusakan pada peralatan listrik
This study aims to analyze the performance of the overcurrent protection system using the Over Current Relay (OCR) on a 60 MVA power transformer at the 70 kV East City Substation in Palembang. This protection system is designed to detect and isolate overcurrent disturbances that can cause damage to electrical equipment. The research methods include data collection, calculation of nominal current, fault current, and OCR settings, and simulation using ETAP software. The results of the study indicate that the OCR successfully detects overcurrent disturbances with a working time that is in accordance with the inverse standard characteristics. Under base load conditions, the relay working time is 0.437 seconds for a fault current of 5.693 kA, while under peak load conditions, the relay working time is faster, namely 0.418 seconds for a fault current of 5.834 kA. Where the OCR research functions to protect electrical equipment against overcurrent Overcurrent can be caused by short circuit current disturbances. The OCR will detect overcurrent and provide a signal to disconnect the electricity, so that it can prevent damage to electrical equipment
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Sistem Proteksi, Over Current Relay (OCR), Transformator Daya, Gardu Induk, Protection System, Over Current Relay (OCR), Power Transformer, Substation, ETAP, Overcurrent, Short Circuit Fault |
| Subjects: | Bidang Keilmuan > Electrical Engineering Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Budi Herdiansyah |
| Date Deposited: | 11 Nov 2025 02:19 |
| Last Modified: | 11 Nov 2025 02:19 |
| URI: | https://repository.itpln.ac.id/id/eprint/3676 |