KOORDINASI SISTEM PROTEKSI GARDU TRAFO DISTRIBUSI 20KV

Istiqomah, Fisi and suwarno, suwarno (2018) KOORDINASI SISTEM PROTEKSI GARDU TRAFO DISTRIBUSI 20KV. Diploma thesis, ITPLN.

[thumbnail of fisi istiqomah.pdf] Text
fisi istiqomah.pdf
Restricted to Registered users only

Download (2MB)

Abstract

Jaringan distribusi sangat berperan penting dalam penyaluran tenaga listrik hingga ke konsumen. Pada umumnya jaringan distribusi paling sering mengalami gangguan khususnya gangguan hubung singkat. Untuk mengamankan saluran distribusi khususnya trafo distribusi agar terhindar dari gangguan dan tidak merugikan pelanggan maka diperlukanlah peralatan proteksi yang handal . Besarnya arus gangguan hubung singkat yang terjadi akan menjadi acuan untuk pemilihan kapasitas dan waktu kerja dari peralatan proteksi yang dipakai untuk mengamankan jaringan dan trafo distribusi seperti Over Current Rellay, Fuse Cut Out dan NH Fuse. Berdasarkan perhitungan yang telah dilakukan ketika terdapat gangguan di jarak 7,5 km dari Gardu Induk sebesar 7,7809kA maka peralatan proteksi yang bekerja terlebih dahulu adalah Fuse Cut Out dengan kapasitas 8 A dengan waktu pemutusan 0,1-300 detik, kemudian jika Fuse gagal bekerja maka Over Current Rellay lah yang akan bekerja dengan TMS 0,22 dan waktu kerja 0,39 detik. Untuk gangguan yang terjadi pada ujung penyulang sebesar 4,4561kA besarnya kapsitas dari Fuse Cut Out sebesar 6,3 A dengan waktu pemutusan 0,1-300 detik , dan jika Fuse gagal bekerja maka NH Fuse yang akan bekerja memproteksi trafo dengan kapasitas sebesar 1250 A dengan waktu kerja 5-10 detik.

The distribution network plays an important role in the distribution of electric power to consumers. In general, the distribution network most frequently experienced disorders in particular disorders of the short circuit. For securing distribution channel, especially distribution transformers in order to avoid distractions and not to the detriment of the customer. it requires the protection equipment that is reliable . The magnitude of short circuit current interruption that occurs will be the reference for the selection of capacity and working time of the protection equipment that is used to secure the network and distribution transformer such as Over Current Rellay, Fuse Cut Out and NH Fuse. Based on the calculations that have been done when there is interference at a distance of 7.5 km from the Substation by 7,7809 kA then the protection equipment that works first is the Fuse Cut Out with a capacity of 8 A with A termination time of 0.1-300 seconds, then if the Fuse fails to work then the Over Current Rellay who will work with the TMS 0.22 and time of labor to 0.39 seconds. To disorders that occur at the ends of the feeders by 4,4561 kA the magnitude of the capacities of the Fuse Cut Out at 6.3 A with A termination time of 0.1-300 seconds , and if the Fuse fails to work then NH Fuse that will work to protect the transformer with a capacity of 1250 A with a working time of 5-10 seconds.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Trafo Distribusi , Koordinasi, Gangguan hubung singkat, Over Current Rellay, Fuse Cut Out, Nh Fuse. Distribution Transformer , Coordination, short circuit, Over Current Rellay, Fuse Cut Out Nh Fuse.
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 11 Nov 2025 07:44
Last Modified: 11 Nov 2025 07:44
URI: https://repository.itpln.ac.id/id/eprint/3739

Actions (login required)

View Item
View Item