KAJIAN OPTIMALISASI KAPASITAS PEMBANGKIT LISTRIK TENAGA MINI HIDRO CIANTEN 1 ( 2 X 1 MW ) DI KABUPATEN BOGOR

Wibowo, H. Wahyu C. and Januwarsono, Santoso (2019) KAJIAN OPTIMALISASI KAPASITAS PEMBANGKIT LISTRIK TENAGA MINI HIDRO CIANTEN 1 ( 2 X 1 MW ) DI KABUPATEN BOGOR. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI.pdf] Text
SKRIPSI.pdf
Restricted to Registered users only

Download (2MB)

Abstract

Indonesia memiliki potensi sumber daya energi terbarukan untuk tenaga minihidro, salah satunya adalah di desa Cibunian terdapat sungai Cianten yang berpotensi mampu membangkitkan tenaga listrik sebesar 2.000 kW. PLTM Cianten 1 sudah beroprasi sejak tahun 2016 hingga saat ini, akan tetapi kinerja dari PLTM Cianten 1 belum bisa memenuhi kebutuhan listrik masyarakat karna menurunnya kapasitas PLTM Cianten 1. Oleh sebab itu, rencana optimalisasipun akan dilakukan. pembangunan PLTM Cianten 1 diharapkan dapat mampu merealisasikan target energi sebesar 74% pada tahun 2021. Sehingga dibutuhkan kajian kelayakan, baik itu dari aspek operasi maupun aspek finansial. Hasil kajian ini menunjukkan bahwa berdasarkan aspek operasi daya yang dihasilkan PLTM Cianten 1 adalah 2.000 kW, besar energi tahunan sekitar 12.024.852 kWh, jatuh tegangan 0,062% dan susut jaringan 0,82%. Serta untuk hasil analisis finansial, pembangunan PLTM Cianten layak untuk dilaksanakan dengan NPV = Rp 37.668.251.189,- , IRR = 20%, BCR = 4,022, dan PBP = 1 tahun 5 bulan.

Indonesia has the potential of renewable energy resources to power minihidro, one of which is in the village Cibunian there is a potentially Cianten River is able to evoke the power of 2,000 kW. PLTM Cianten 1 already operations beginning in 2016, but the performance of PLTM Cianten 1 cannot yet meet the electricity needs of society because of a declining capacity PLTM Cianten 1. Therefore, plan optimalisasipun will be done. PLTM development Cianten 1 is expected to be able to realize target energy amounted to 74% in 2021. Feasibility studies needed so that both aspects of the operations as well as financial aspects. The results of the study suggest that based on aspects of the operation of the power generated PLTM Cianten 1 was 2,000 kW, large annual energy of approximately 12,024,852 kWh, fell 0.062% and reduced voltage network 0.82%. As well as for financial analysis results, development PLTM Tabalar deserves to be implemented with NPV = Rp 37,668,251,189,- , IRR = 20%, BCR = 4.022, and PBP = 1 year 5 months.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Pembangkit Listrik Tenaga Minihidro, Kajian Kelayakan, Operasi, Finansial. Minihidro Power Plant, Feasibility Studies, Operations, Financial.
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 12 Nov 2025 07:20
Last Modified: 12 Nov 2025 07:20
URI: https://repository.itpln.ac.id/id/eprint/3784

Actions (login required)

View Item
View Item