Herlisa, Fani and SIREGAR, MASBAH R T and Hutajulu, Albert Gifson (2018) ANALISA EFISIENSI PEMBANGKIT LISTRIK TENAGA SURYA 2 MW JAKABARINGANALISA EFISIENSI PEMBANGKIT LISTRIK TENAGA SURYA 2 MW JAKABARING. Diploma thesis, ITPLN.
Fani 201411132.pdf
Restricted to Registered users only
Download (2MB)
Abstract
Indonesia merupakan negara yang berada di wilayah khatulistiwa dimana sumber energi matahari sangat melimpah dan tersedia sepanjang tahun, sehingga sangatlah tepat jika diambil langkah pemanfaatan energi radiasi matahari dengan cara mengkonversinya menjadi energi listrik dengan penggunaan sel surya atau photovoltaik. Pembangkit Listrik Tenaga Surya telah mencapai peningkatan dari tahun ke tahun. Salah satu kota yang membangun PLTS adalah Kota Palembang. Kota Palembang memiliki potensi dalam mengembangkan pembangunan PLTS. Dengan keadaan alamnya, kota Palembang termasuk daerah tropis dengan suhu rata-rata sebagian besar wilayah kota ini adalah sekitar 21o -32o Celcius, dengan curah hujan 22-428 mml per tahun. PLTS yang dibangun di Kota Palembang berlokasi di Kecamatan Jakabaring. Secara astronomis, kecamatan ini berada pada posisi 3o0’37” Lintang Selatan dan 104o47’28” Bujur Timur. Pada lokasi, terpasang modul surya sebanyak 5248 buah modul dengan kapasitas masing-masing modul sebesar 315 Wp dengan tipe modul Poly-crystalline yang di produksi oleh SHARP. Modul yang terpasang di lokasi memiliki daya optimal sebesar 1.6 MW. Untuk mencapai daya optimal sebesar 2 MW diperlukan penambahan modul surya sebanyak 2624 buah modul. Sehingga jumlah keseluruhan modul sebanyak 7872 buah modul.
Indonesia is a country located in the equator where the source of solar energy is very abundant and available throughout the year, so it is very appropriate if taken steps utilization of solar radiation energy by converting it into electrical energy with the use of solar cells or photovoltaic. Solar Power Plant has been increasing year by year. One of the cities that build PLTS is Palembang. Palembang city has potential to developing the development of PLTS. With its natural state, Palembang is a tropical region with an average temperature of most in this city area around 21o - 32o Celcius, with rainfall around 22-428 mml per year. PLTS that built in Palembang City is located in Jakabaring District. Astronomically, this district is in position 3o0'37 "South Latitude and 104o47'28" East Longitude. At the location, there were 5248 solar modules installed, with each module capacity is 315 Wp with type of the modul is poly-crystalline produced by SHARP. The locally installed module has an optimum power 1.6 MW. To achieve optimal power 2 MW, required the addition of solar modules as much as 2624 modules. So the total number of modules is 7872 modules.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | PLTS, Potensi, Energi, Palembang PLTS, Potential, Energy, Palembang |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 12 Nov 2025 12:21 |
| Last Modified: | 12 Nov 2025 12:21 |
| URI: | https://repository.itpln.ac.id/id/eprint/3791 |