KAJIAN PENGARUH PEMASANGAN GENERATOR DISTRIBUSI PADA PENYULANG PKL 10 TERHADAP PENYETELAN RELE ARUS LEBIH DAN RELE GANGGUAN TANAH

Ikhsanillah, Muhammad Dawam and Sampurno, Sampurno (2018) KAJIAN PENGARUH PEMASANGAN GENERATOR DISTRIBUSI PADA PENYULANG PKL 10 TERHADAP PENYETELAN RELE ARUS LEBIH DAN RELE GANGGUAN TANAH. Diploma thesis, ITPLN.

[thumbnail of Skripsi Muhammad Dawam Ikhsanillah 201411116.pdf] Text
Skripsi Muhammad Dawam Ikhsanillah 201411116.pdf
Restricted to Registered users only

Download (2MB)

Abstract

Pengadaan Pembangkit Listrik Tenaga Minihidro (PLTM) di daerah Lebak Barang, Pekalongan, mempunyai peranan yang cukup penting dalam memenuhi kebutuhan daya listrik. Namun, pemasangan generator distribusi pada sistem distribusi radial ternyata dapat memberikan kontribusi meningkatnya arus. Hal tersebut dapat menjadi salah satu penyebab gangguan hubung singkat dapat melebihi nilai maksimum dari sistem proteksi yang telah ada pada jaringan. Hal ini dapat mengganggu selektivitas dari sistem peroteksi sehingga perlu dilakukan suatu penelitian untuk mengetahuinya. Dalam Tugas Akhir ini dilakukan setting peralatan proteksi yang digunakan untuk melindungi peralatan listrik dalam sistem distribusi tenaga listrik seperti rele arus lebih, rele gangguan tanah dan recloser. Area yang diteliti adalah jaringan proteksi di Penyulang Pkl 07. Dengan dilakukannya penelitian ini maka dapat diketahui setting koordinasi proteksi setelah dipasang DG pada penyulang PKL 10, pada ujung jaringan sebelum ada PLTMH di bangun gardu hubung untuk mentap dari sisi PLTMH ke jaringan PLN .adanya rele pada gardu hubung yang di pasang sehingga koordinasi rele rele di setting ulang untuk menghindari gagal koordinasi.

Procurement of Minihydro Power Plants (PLTM) in the Lebak Barang area, Pekalongan, has an important role in meeting the electricity needs. However, the installation of a distribution generator in the radial distribution system turns out to be able to contribute to the increasing flow. This can be one of the causes of short circuit interference can exceed the maximum value of the protection system that is already on the network. This can interfere with the selectivity of the voting system so that a research is needed to find out. In this Final Project, setting protection equipment is used to protect electrical equipment in electrical power distribution systems such as overcurrent relay, ground fault relay and recloser. The area under study is the protection network at Penyulang Pkl 07. With this research, it can be seen that the protection coordination settings after installing DG on PKL 10 feeder, at the end of the network before there is PLTMH built a substation to fit from the MHP side to the PLN network. on the connected substation so that the relay relay coordination is reset to avoid coordination failure

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Gangguan, Generator Distribusi dan Sistem Proteksi Disturbance, Distribution Generator and Protection System
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 13 Nov 2025 03:19
Last Modified: 13 Nov 2025 03:19
URI: https://repository.itpln.ac.id/id/eprint/3813

Actions (login required)

View Item
View Item