Amrin, Muhamad and Willy, Purnomo (2018) KAJIAN PARTIAL DISCHARGE PADA TRANSFORMATOR DAYA. Diploma thesis, ITPLN.
Muhamad Amrin (2014 11 048).pdf
Restricted to Registered users only
Download (5MB)
Abstract
Pengunaan transformator daya dalam sistem tenaga listrik secara garis besar terdiri dari, transformator penaik tegangan generator dipusat listrik menjadi tegangan transmisi. Transformator penurun tegangan transmisi menjadi distribusi primer digardu induk. Transformator distribusi digardu distribusi yang menurunkan tegangan menengah menjadi tegangan rendah. Partial discharge bukanlah penyebab, akan tetapi merupakan gejala terjadinya kegagalan sistem isolasi didalam peralatan penyaluran tenaga listrik. Terdeteksinya partial discharge menunjukkan adanya masalah didalam sistem isolasi tersebut. Tujuan utama pendeteksian partial discharge adalah untuk memastikan apakah kualitas isolasi memenuhi harapan atau tidak. Penelitian ini akan membahas pendeteksian partial discharge menggunkan metode akustik dengan sensor AE (sensor akustik) dan sensor HFCT. Alat yang digunakan yaitu PowerPD-TP500A. Pengujian partial discharge dilakukan pada transformator daya 60MVA 150Kv, yaitu trafo 3 GI Cikupa, trafo 1 GIS AGP, trafo 1 GIS Denayasa. Berdasarkan pengujian diperolah hasil bahwa sinyal tersebut dikatakan sinyal partial discharge jika kedua sensor mendeteksi sinyal, sinyal yang dideteksi terjadi secara konstan dalam waktu yang sangat cepat, seperti pada hasil trafo 3 GI Cikupa yaitu didapat gap time 3ms. Celah dari sinyal yang terdeteksi selalu sama (konstan) dari masing-masing sinyal. Sinyal partial discharge dipengaruhi oleh celah pada sinyal yang terdeteksi. Besar atau kuatnya sinyal tidak berpegaruh terhadap kecenderungan partial discharge.
The use of a power transformer in a power system outline consists of, the transformer raising of generator voltage at the center of the electricity into the transmission voltage. Transmission reducer Voltage Transformer to primary distribution in substation. Transformer distribution in substation that lowers the medium voltage into low voltage. Partial discharge is not the cause, but it is a symptom of the failure of the insulation system in the electrical distribution equipment. Partial discharge detection indicates a problem in the isolation system. The main purpose of partial discharge detection is to ascertain whether the quality of insulation meets expectations or not. This research will discuss partial discharge detection using acoustic method with AE sensor (acoustic sensor) and HFCT sensor. The tool used is the PowerPD-TP500A. The partial discharge test was performed on a 60MVA 150Kv power transformer, that is transformer 3 GI Cikupa, transformer 1 GIS AGP, transformer 1 GIS Denayasa. Based on the test results obtained that the signal is said to be a partial discharge signal if the two sensors detect the signal, the detected signal occurs constantly in a very fast time, as in the results of the Cikupa GI transformer 3 is obtained 3ms gap time. Gap time from the detected signal is always the same (constant) of each signal. The partial discharge signal is affected by the gap time in the detected signal. The magnitude or strength of the signal does not affect the partial discharge tendency.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Transformator, Partial Discharge, Metode Akustik Transformer, Partial Discharge, Acoustic Method |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 16 Nov 2025 10:23 |
| Last Modified: | 16 Nov 2025 10:23 |
| URI: | https://repository.itpln.ac.id/id/eprint/3895 |