Abstract
Pada sistem tenaga listrik, proteksi merupakan bagian yang paling penting. Kerusakan pada sistem proteksi akan menyebabkan kerusakan pada peralatan listrik, bila ini terjadi akan menyebabkan kerusakan pada peralatan listrik, pemadaman yang cukup lama dan mengganggu proses penyediaan tenaga listrik atau proses produksi pada konsumen. Maka dari itu peningkatan kualitas pelayanan PT. PLN (Persero) harus semakin baik seiring bertambahnya waktu agar pelanggan atau konsumen dapat terpuaskan. Pada skripsi ini akan dibahas tentang setting perhitungan relai yang ada di CBO maupun penyulang Bayu di gardu induk Gandul. Dari perhitungan didapat bahwa relai hasil setting perhitungan pada CBO bekerja lebih cepat daripada hasil setting relai di sisi outgoing penyulang. Dari hasil perhitungan data di atas didapat nilai setting waktu relai pada sisi outgoing penyulang adalah 0,7 detik dengan nilai TMS adalah 0,46. Sedangkan pada pada sisi kubikel CBO didapat setting waktu relai adalah 0,29 detik dengan TMS 0,19. Nilai tersebut membuktikan kerja relai pada kubikel CBO lebih cepat dari kerja relai outgoing penyulang.
In electric power sistems, protection is the most important part. Damage to the protection sistem will cause damage to electrical equipment, if this happens will causes damage to electrical equipment, long enough outages and disrupt the process of providing electricity or production processes to consumers. Therefore improvement of service quality of PT. PLN (Persero) should get better as time increases so that customers or consumers can be satisfied.In this thesis will be discussed about setting the calculation of the existing relaiases in CBO and Bayu penyulang in Gandul substation. From the calculation found that the results of the calculation of the calculation on the CBO work faster than the result setting relai on outgoing side of the repeater. From the above data calculation results obtained relai time setting value on the outgoing side of the repeater is 0.7 seconds with the value of TMS is 0.46. While on the side of cubicle CBO obtained setting time relai is 0.29 seconds with TMS 0.19. The value proves the relai work on CBO cubicles faster than the reloading outgoing work of the feeder.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Proteksi, CBO, Distribusi Protection Sistem, CBO, Distribution Sistem |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 16 Nov 2025 11:17 |
| Last Modified: | 16 Nov 2025 11:17 |
| URI: | https://repository.itpln.ac.id/id/eprint/3903 |