ANALISIS KINERJA PLTS ON-GRID DI GILI TRAWANGAN LOMBOK

Putri, Fidiya Destiana and Hafidz, Mohammad (2018) ANALISIS KINERJA PLTS ON-GRID DI GILI TRAWANGAN LOMBOK. Diploma thesis, ITPLN.

[thumbnail of FIDI PDF.pdf] Text
FIDI PDF.pdf
Restricted to Registered users only

Download (2MB)

Abstract

Pembangkit Listrik Tenaga Surya (PLTS) Gili Trawangan merupakan salah satu pembangkit listrik yang dibangun di lokasi yang jauh dari jaringan listrik PLN yaitu terletak di sebelah utara laut Lombok dimana untuk mengunjunginya harus menyeberang pulau selama 50 menit. PLTS Gili Trawangan terhubung langsung dengan jaringan PLN melalui kabel bawah laut 20 kV. Sejak PLTS Gili Trawangan beroperasi pada Mei 2012, masih belum banyak diketahui produksi energi listrik yang optimum dan Performance Ratio (PR) yang merupakan parameter kinerja suatu PLTS, sehingga perlu dilakukan analisis terkait dengan kinerja PLTS Gili Trawangan. Untuk mengetahui potensi optimum PLTS Gili Trawangan, maka dilakukan pengukuran radiasi, temperatur suhu, daya DC dan daya AC. Kemudian hasil dari pengukuran tersebut dilakukan perhitungan sehingga dapat diketahui nilai Performance Ratio (PR) serta efisiensi PLTS Gili Trawangan. Dari pengukuran dan perhitungan diperoleh nilai Performance Ratio (PR) pada combiner box 6 s/d 10, berturut-turut adalah 70%; 81%; 77%; 75% dan 70%. Nilai efisiensi yang diperoleh adalah 94,73%. Temperatur suhu pada PLTS Gili Trawangan sangat tinggi mencapai 48°C dan radiasi tertinggi adalah 1111 W/m2. Selain itu dilakukan analisis terhadap faktor lingkungan yang mempengaruhi kinerja PLTS Gili Trawangan.

Gili Trawangan Solar Power Plant is one of the power plant built in a location far from PLN electricity network that is located in northern sea Lombok where to visit it must cross the island for 50 minutes. Gili Trawangan Solar Power Plant is directly connected to the PLN network through a 20 kV submarine cable. Since Gili Trawangan Solar Power Plant operates in May 2012, it is still not known that optimum energy production and Performance Ratio (PR) is a performance parameter of a Solar Power Plant, therefore it is necessary to analyze the performance of Gili Trawangan Solar Power Plant. To know the optimum potential of Gili Trawangan Solar Power Plant, radiation measurement, temperature, Direct Current (DC) power and Alternating Current (AC) power are measured. Then the results of these measurements are calculated so that it can be known the value of Performance Ratio (PR) and efficiency of Gili Trawangan Solar Power Plant. From the measurement and calculation, the value of Performance Ratio (PR) in combiner box 6 until 10 is 70%; 81%; 77%; 75% and 70%. The efficiency value obtained is 94.73%. The temperature at Gili Trawangan Solar Power Plant is very high reach 48°C and the highest radiation is 1111 W/m2 . In addition, an analysis of environmental factors that affect the performance of Gili Trawangan Solar Power Plant.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: PLTS Gili Trawangan, performance ratio (PR), produksi listrik, tempertaur, radiasi Gili Trawangan Solar Power Plant, Performance Ratio (PR), energy production, temperature, radiation
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 19 Nov 2025 14:04
Last Modified: 19 Nov 2025 14:04
URI: https://repository.itpln.ac.id/id/eprint/3905

Actions (login required)

View Item
View Item