Jaringan Distribusi merupakan salah satu sistem tenaga listrik yang tidak dapat terhindar dari gangguan, Khususnya gangguan hubung singkat, baik hubung singkat tiga fasa, fasa dengan fasa atau hubung singkat antara fasa dengan tanah. Untuk melokalisasi gangguan tersebut diperlukan system proteksi yang memenuhi persyaratan sensitifitas, keandalan, selektifitas dan kecepatan. Peralatan proteksi yang sering digunakan pada system distribusi adalah over current relay (OCR) dan ground fault relay (GFR), yaitu relai yang berfungsi memberi perintah PMT untuk membuka, sehingga saluran yang terganggu dipisahkan dari jaringan. Pada skripsi ini membahas koordinasi system proteksi antar rele arus lebih dan rele gangguan tanah sebagai peralatan pengaman khususnya pada penyulang Anting, GI Duri Kosambi, Area Cengkareng. Dimana arus hubung singkat terbesar pada 3 phasa nya adalah 12616,704 A dan arus hubung singkat terbesar pada 1 phasa nya adalah 951,035 A. Untuk waktu kerja rele utama pada OCR adalah 0,16 detik sedangkan waktu kerja rele utama pada GFR adalah 0,26 detik.
Distribution Network is one of the electric power systems that cannot avoid interference, especially short circuit distrubances, both three phase short circuit,phase with phase or short circuit between phase and ground. To localize the interference, a protection system is needed which meets the requirements of sensitivity, reliability, selectivity and speed. Protection equipment that is often used in distribution systems is over current relay (OCR) and ground fault relay (GFR), which is a relay that functions to give PMT commands to open, so that the disturbed channels are separated from the network. The focus of this thesis is coordination of protection system between over current relay and ground fault relay as protective equipment especially on Anting feeder, Duri Kosambi Substations, Cengkareng Area. Where the largest short circuit current at 3 phase is 12616,704 A and the largest short circuit current at 1 phase is 951,035 A. For the main relay working time on OCR is 0,24 second while the main relay working time on GFR is 0,39 second.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Arus Hubung Singkat, Relai Arus Lebih, Relai Gangguan Tanah. relay, electric power, interference, protection system. |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 19 Nov 2025 14:13 |
| Last Modified: | 19 Nov 2025 14:13 |
| URI: | https://repository.itpln.ac.id/id/eprint/3948 |