ANALISA SISTEM KONTROL LEVEL AIR DRUM BOILER PADA PLTU BANTEN 1 SURALAYA

Tarigan, Pirnando and Yogianto, Aloysius Agus (2018) ANALISA SISTEM KONTROL LEVEL AIR DRUM BOILER PADA PLTU BANTEN 1 SURALAYA. Diploma thesis, ITPLN.

[thumbnail of Pirnando Tarigan 2014-11-032.pdf] Text
Pirnando Tarigan 2014-11-032.pdf
Restricted to Registered users only

Download (3MB)

Abstract

Penyediaan energi listrik di Indonesia saat ini didominasi oleh PLTU berbahan bakar batubara. Unit Jasa Pembangkitan Banten 1 Suralaya merupakan salah satu Program Percepatan Diversifikasi Energi (PPDE) 10.000 MW tahap 1 dengan daya yang dihasilkan 625 MW. Program ini dicetuskan dalam rangka mengantisipasi kebutuhan listrik yang terus meningkat dan sekaligus untuk melakukan penghematan dalam penggunaan Bahan Bakar Minyak (BBM). Sering kali dalam penyediaan listrik untuk konsumen, sistem mengalami gangguan yang diakibatkan oleh lonjakan beban yang mendadak. Hal ini akan menambah beban kerja boiler dalam menghasilkan steam untuk keperluan turbin serta Boiler Feedwater Pump dalam menyuplai air ke drum. Maka dari itu perlunya dilakukan analisa sistem kontrol level air drum boiler pada PLTU Banten 1 Suralaya untuk melihat performa sistem kontrol tersebut. Hasil perhitungan standar deviasi menunjukkan bahwa sistem kontrol level air drum boiler yang digunakan stabil dengan nilai sebesar 2.961%. Berdasarkan perhitungan nilai error level, performa sistem kontrol level air drum boiler PLTU Banten 1 Suralaya dari segi errormasih kurang baik dimana nilai error mencapai 10.27%.

The provision of electrical energy in Indonesia is currently dominated by coal-fired power plants. Banten Power Generation Unit 1 Suralaya is one of the 10,000 MW Energy Diversification Acceleration Program (PPDE) phase 1 with power generated 625 MW. This program is initiated in order to anticipate the increasing demand of electricity and simultaneously to make savings in the use of Fuel (BBM). Often in the supply of electricity for the consumer, the system experiences a disruption caused by sudden spikes. This will increase the boiler's workload in generating steam for turbine purposes as well as the Feedwater Pump Boiler in supplying water to the drum. Therefore, it is necessary to analyze the drum boiler water level control system in PLTU Banten 1 Suralaya to see the performance of the control system. The result of standard deviation calculation shows that the boiler drum water level control system used stable with the value of 2,961%. Based on the calculation of the error rate, the performance of water level drum boiler control system of PLTU Banten 1 Suralaya in terms of error is still not good where the error value reaches 10.27%.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Sistem Kontrol, error, performa, drum boiler Control system, error, performance, drum boiler
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro