Prasetia, Areandhy Rizky and Siswoyo., Sriyono D (2022) ANALISIS KETERLAMBATAN PEKERJAAN BOREPILE DENGAN METODE DIAGRAM FISHBONE 6. ( Studi Kasus: Proyek Pekerjaan Dinding Penahan Banjir BSD SERPONG ). Diploma thesis, ITPLN.
![[thumbnail of Areandhy Rizky Prasetia_201621012.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
Areandhy Rizky Prasetia_201621012.pdf
Restricted to Repository staff only
Download (1MB)
Abstract
Pekerjaan borepile yang terdapat pada proyek Dinding Penahan Banjir BSD Serpong mengalami keterlambatan dari rencana awal dikarenakan berbagai faktor mulai dari faktor intern maupun faktor extern yang mengakibatkan pekerjaan borepile ini mengalami keterlambatan, tujuan dari penelitian ini adalah mengidentifikasi dan mengklasifikasi faktor-faktor yang menjadi penyebab keterlambatan proyek konstruksi khususnya pekerjaan borepile. Adapun faktor yang mempengaruhi antara lain pekerja, mesin, metode, biaya, material, maupun faktor lingkungan. Dilakukannya analisis keterlambatan pada pekerjaan borepile ini bermaksud untuk mendapatkan faktor utama dari keterlambatan yang terjadi pada pekerjaan tersebut dengan menggunakan metode diagram fishbone sebagai acuan untuk menentukan permasalahan utama yang terjadi pada pekerjaan borepile ini, metode yang digunakan adalah diagram fishbone dengan instrumen penelitian berupa penyebaran pertanyaan berupa kuesioner, uji validitas, uji reabilitas dan uji frekuensi. Dari data yang telah dikumpulkan dengan cara pembagian pertanyaan kepada 25 responden yang telah dilakukan. Dan dari uji validitas untuk semua responden didapatkan 20 pertanyaan dikatakan valid dikarenakan nilai korelasi dari semua variabel melebihi dari 0,394 dari nilai rtabel dan juga dikatakan reliabel karena nilai cronbach’s alpha>0,700. Dengan uji frekuensi yang dilakukan didapatkan bahwa faktor utama dari keterlambatan pekerjaan borepile pada proyek dinding Penahan Banjir BSD Serpong adalah faktor Environmen dengan nilai rata-rata tertinggi faktor utama nya adalah Cuaca. Untuk Mendapatkan Hasil uji validitas, uji reabilitas dan uji frekuensi menggunakan program pendukung Microsoft Excel.
The borepile work contained in the BSD Serpong Wall project experienced delays from the initial plan due to various factors ranging from internal factors and external factors that resulted in delays in the borepile work, the purpose of this study is to identify and classify the factors that cause construction project delays especially borepile work. The influencing factors include workers, machines, methods, costs, materials, and environmental factors. The analysis of delays in borepile work is intended to find the main factors of delays that occur in the work by using the fishbone diagram method as a reference to determine the main problems that occur in this borepile work, the method used is a fishbone diagram with research instruments in the form of spreading questions in the form of questionnaire, validity test, reliability test and frequency test. From the data that has been collected by way of distributing questions to 25 respondents that has been done. And from the validity test for all respondents, 20 questions were found to be valid because the correlation value of all variables exceeded 0.394 from the rtable value and was also said to be reliable because Cronbach's alpha value was > 0.700. With the frequency test conducted, it was found that the main factor of delay in borepile work on the BSD Serpong wall fence project is the environmental factor with the highest average value the main factor being weather. To get the results of the validity test, reliability test and frequency test using a Microsoft Excel support program.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | keterlambatan, borepile, diagram fishbone delay, borepile, fishbone diagram |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 01 Sep 2025 06:53 |
Last Modified: | 01 Sep 2025 06:55 |
URI: | https://repository.itpln.ac.id/id/eprint/395 |