KAJIAN SISTEM PROTEKSI IBT 500/150KV, 500MVA DI SISTEM TERHADAP PEMBEBANAN LEBIH DENGAN MENGGUNAKAN OLS DI SUBSISTEM KRIAN-GRESIK

Syahreza, Isfan and Sampurno, Sampurno (2018) KAJIAN SISTEM PROTEKSI IBT 500/150KV, 500MVA DI SISTEM TERHADAP PEMBEBANAN LEBIH DENGAN MENGGUNAKAN OLS DI SUBSISTEM KRIAN-GRESIK. Diploma thesis, ITPLN.

[thumbnail of COVER.pdf] Text
COVER.pdf

Download (15kB)
[thumbnail of HALAMAN PERNYATAAN PERSETUJUAN PUBLIKASI.pdf] Text
HALAMAN PERNYATAAN PERSETUJUAN PUBLIKASI.pdf

Download (146kB)
[thumbnail of DAFTAR RIWAYAT HIDUP.pdf] Text
DAFTAR RIWAYAT HIDUP.pdf

Download (98kB)
[thumbnail of DAFTAR PUSTAKA.pdf] Text
DAFTAR PUSTAKA.pdf

Download (114kB)
[thumbnail of DAFTAR ISI.pdf] Text
DAFTAR ISI.pdf

Download (215kB)
[thumbnail of PERNYATAAN KEASLIAN SKRIPSI.pdf] Text
PERNYATAAN KEASLIAN SKRIPSI.pdf

Download (83kB)
[thumbnail of UCAPAN TERIMA KASIH.pdf] Text
UCAPAN TERIMA KASIH.pdf

Download (83kB)
[thumbnail of BAB 1&2 .pdf] Text
BAB 1&2 .pdf

Download (330kB)
[thumbnail of BAB III .pdf] Text
BAB III .pdf
Restricted to Registered users only

Download (682kB)
[thumbnail of BAB IV .pdf] Text
BAB IV .pdf
Restricted to Registered users only

Download (1MB)
[thumbnail of BAB V .pdf] Text
BAB V .pdf
Restricted to Registered users only

Download (84kB)
[thumbnail of ABSTRAK.pdf] Text
ABSTRAK.pdf

Download (11kB)

Abstract

Sistem proteksi tenaga listrik merupakan suatu aspek yang sangat dibutuhkan dalam pelaksanaan sistem operasi tenaga listrik. Proteksi ini dimaksudkan untuk mencegah terjadinya gangguan secara meluas yang dapat mengganggu seluruh sistem. Salah satu cara untuk mengatasi permasalahan black out atau pemadaman total pada suatu sistem atau subsistem tenaga listrik adalah dengan menerapkan skema Overload Shedding (OLS) atau pelepasan beban lebih pada Interbus Transformer (IBT). Dalam skripsi ini membahas tentang skema Over Load Shedding pada IBT1&2 Surabaya Barat dan IBT1 Gresik pada subsistem Krian-Gresik. Dari hasil penelitian yang dilakukan , didapat setting skema OLS pada subsistem Krian-Gresik. Pada kondisi IBT1 Surabaya Barat trip dilakukan 3 tahapan pelepasan sebesar 330MW. Pada kondisi IBT1 Gresik trip dilakukan 3 tahapan pelepasan beban sebesar 330MW dan pada kondisi IBT1&2 Surabaya Barat Trip dilakukan 5 tahapan pelepasan sebesar 644MW. Simulasi pelepasan beban pada IBT yang trip menggunakan software Digital SimuLation and Electrical NeTwork calculation program (DIgSILENT).

Electricity protection system is an aspect that is very much needed in the implementation of an electric power operating system. This protection is intended to prevent widespread interference that can disrupt the entire system. One way to overcome the problem of black out or total blackout on an electric power system or subsystem is to apply the Overload Shedding (OLS) scheme or release more load on the Interbus Transformer (IBT). In this paper discusses the scheme of Over Load Shedding in West Surabaya IBT1 & 2 and Gresik IBT1 in the Krian-Gresik subsystem. From the results of the research conducted, the OLS scheme setting on the Krian-Gresik subsystem was obtained. In the IBT1 condition West Surabaya trip was carried out 3 steps of 330MW. In the condition of IBT1, the Gresik trip was carried out in 3 stages of load release of 330MW and in IBT1 & 2 conditions West Surabaya Trip was carried out with 5 stages of release of 644MW. The load release simulation on IBT that was trip using the Digital Simulations and Electrical Neural Work Calculation Program (DIgSILENT) software.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Over Load Shedding (OLS), overload, trip, IBT. Over Load Shedding (OLS), overload, trip, IBT.
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 19 Nov 2025 15:21
Last Modified: 19 Nov 2025 15:21
URI: https://repository.itpln.ac.id/id/eprint/3951

Actions (login required)

View Item
View Item