Saragih, Zyang Ardani and Yogianto, Aloysius Agus (2018) ANALISA EFISIENSI PEMBANGKIT LISTRIK TENAGA SURYA TERHUBUNG JARINGAN DI GILI KABUPATEN LOMBOK UTARA. Diploma thesis, ITPLN.
SKRIPSI ZYANG ARDANI SARAGIH 2014-11-018.pdf
Restricted to Registered users only
Download (6MB)
Abstract
Dengan kondisi iklim tropis yang mendapatkan sinar matahari sepanjang tahun maka Indonesia memiliki insolasi energi cahaya matahari mencapai ratarata 4.8 kWh/m2 , sehingga Indonesia terbukti telah mengahasilkan energi listrik melalui Pembangkit Listrik Tenaga Surya (PLTS). Dengan Program Pemerintah Indonesia yang selalu mendorong dalam pemamfaatan Energi Baru Terbarukan (EBT), sehingga beroperasilah PLTS Gili Air 161,28 kWp dan Gili Meno 60,48 kWp di Kabupaten Lombok Utara. Dengan beroperasi perlu untuk menganalisa efisiensinya baik dari segi komponen dan efisiensi sistemnya, hasil ini akan dijadikan sebagai acuan untuk pembangunan PLTS baru diberbagai wilayah Indonesia. PV array yang paling efisien pada saat beroperasi pada cuaca cerah maupun cuaca mendung adalah PV array 1 PLTS Gili Air. Semua inverter yang beroperasi pada PLTS Gili Air dan Gili Meno masih tergolong bekerja maksimal dimana efisiensinya rata-rata 92-95% untuk cuaca cerah dan 85-90% untuk cuaca mendung. Efisiensi sistem PLTS Gili Air pada cuaca cerah 11,58% dan 8,56% pada cuaca mendung sedangkan efisiensi sistem PLTS Gili Meno pada cuaca cerah 10,73% dan 8,54% pada cuaca mendung, dengan nilai keuntungan terpasangnya kedua PLTS Rp 34.198.575,00
With tropical climate conditions that get sunlight throughout the year, Indonesia has insulated solar energy to an average of 4.8 kWh / m2, so Indonesia has proven to produce electricity through a Solar Power Plant (PLTS). With the Indonesian Government Program which always encourages the use of Renewable Energy (EBT), so it operates PLTS Gili Air 161.28 kWp and Gili Meno 60.48 kWp in North Lombok Regency. By operating it is necessary to analyze its efficiency both in terms of components and system efficiency, these results will be used as a reference for the construction of new PLTS in various parts of Indonesia. The most efficient PV array when operating in sunny and cloudy weather is PV array 1 PLTS Gili Air. All inverters operating on Gili Air and Gili Meno PLTS are still working optimally where the average efficiency is 92-95% for sunny weather and 85-90% for cloudy weather. Efficiency of Gili Air PLTS system on sunny weather was 11.58% and 8.56% in cloudy weather while Gili Meno PLTS system efficiency in sunny weather was 10.73% and 8.54% in cloudy weather, with the advantage of the second installed PLTS Rp 34,198 .575,00
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | PV array, Insolasi, Efisiensi PV array, Insulation, Efficiency |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 20 Nov 2025 14:32 |
| Last Modified: | 20 Nov 2025 14:32 |
| URI: | https://repository.itpln.ac.id/id/eprint/3990 |