ANALISA SELISIH HARGA SATUAN PEKERJAAN PENGECORAN PILE CAP ANTARA METODE AKTUAL DAN SNI PROYEK PEMBANGUNAN SALURAN UDARA TEGANGAN TINGGI (SUTT) 150 kV TELUK NAGA

FADHLURRAHMAN, MUH FIKRI and Siswoyo, Sriyono D (2022) ANALISA SELISIH HARGA SATUAN PEKERJAAN PENGECORAN PILE CAP ANTARA METODE AKTUAL DAN SNI PROYEK PEMBANGUNAN SALURAN UDARA TEGANGAN TINGGI (SUTT) 150 kV TELUK NAGA. Diploma thesis, ITPLN.

[thumbnail of Muh Fikri Fadhlurrahman 201621081.pdf] Text
Muh Fikri Fadhlurrahman 201621081.pdf
Restricted to Repository staff only

Download (3MB)

Abstract

Tugas akhir yang berjudul “Analisa Selisih Harga Satuan Pekerjaan Pengecoran Pile Cap Antara Metode Aktual Dan SNI Proyek Pembangunan Saluran Udara Tegangan Tinggi 150 kV Teluk Naga” bertujuan untuk mengetahui harga pekerjaan pengecoran pile cap setiap 1m3 antara kondisi aktual di lapangan dengan SNI yang merupakan Analisa Harga Satuan Pekerjaan yang telah tertuang dalam Peraturan Menteri PUPR No 28 Tahun 2016. Metode pengumpulan data yang digunakan adalah pangamatan langsung di lapangan, pengumpulan data-data laporan harian pekerjaan dan data harga satuan, lalu dari hasil hasil tersebut akan dibandingkan dengan analisa komparatif. Hasil yang didapatkan pada penelitian ini adalah harga satuan pekerjaan pengecoran pile cap setiap 1m3 pada proyek pembangunan saluran udara tegangan tinggi 150 kV Teluk Naga dengan metode aktual adalah sebesar 1.304.076,97 rupiah, sedangkan menggunakan SNI adalah sebesar 1.550.644,20 rupiah. Selisih presentasenya adalah metode aktual lebih murah sebesar 15,90% dari SNI, atau selisih sebesar 246.567,23 rupiah.

The final project entitled "Analysis of the Difference in Unit Price of Pile Cap Casting Work Units Between the Actual Method and SNI for the 150 kV High Voltage Airway Construction Project in Teluk Naga" aims to determine the price of pile cap casting work every 1m3between the actual conditions in the field and SNI which is an analysis Work Unit Prices which have been stated in the PUPR Ministerial Regulation No. 28 of 2016. The data collection method used is direct observation in the field, collecting daily work report data and unit price data, then the results will be compared with comparative analysis. The results obtained in this study are the unit price of pile cap casting work every 1 m3 on the construction project of the 150 kV high voltage overhead line Teluk Naga with the actual method is 1,304,076.97 rupiah, while using SNI is 1,550,644.20 rupiah. . The percentage difference is that the actual method is 15.90% cheaper than SNI, or the difference is 246,567.23 rupiahs.a

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Metode Aktual, SNI, Harga Satuan Pekerjan Actual Method, SNI, Work Unit Price
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 01 Sep 2025 07:37
Last Modified: 01 Sep 2025 07:37
URI: https://repository.itpln.ac.id/id/eprint/401

Actions (login required)

View Item
View Item