ANALISIS PENERAPAN PENGENDALIAN BIAYA UNTUK MENGURANGI COST OVERRUN BERBASIS MANAJEMEN RISIKO PADA PROYEK KONSTRUKSI PEMBANGUNAN GEDUNG POLDA MALUKU

Sandewa, Ode Tio Maulana and Sepriyanna, Irma (2022) ANALISIS PENERAPAN PENGENDALIAN BIAYA UNTUK MENGURANGI COST OVERRUN BERBASIS MANAJEMEN RISIKO PADA PROYEK KONSTRUKSI PEMBANGUNAN GEDUNG POLDA MALUKU. Diploma thesis, ITPLN.

[thumbnail of ODE TIO MAULANA SANDEWA 201621093.pdf] Text
ODE TIO MAULANA SANDEWA 201621093.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

Pada pelaksanaan sebuah proyek konstruksi dibatasi biaya, mutu, waktu. Mencapai keberhasilan dalam sebuah proyek, diperlukan adanya manajemen yang baik dengan adanya pengendalian yang dapat mempengarahui hasil akhir suatu proyek. Pengendalian yang baik dapat mengurangi risiko terjadinya keterlambatan dan pembengkakan biaya (cost ovverun). Tujuan dari penelitian ini Menganalisis kegiatan yang dilakukan dalam proses pengendalian biaya proyek konstruksi Pembengunan Gedung Kantor dan Fasilitas Umum Polda Maluku, Menganalisis faktor risiko yang menyebabkan cost overrun pada pengendalian biaya proyek konstruksi Pembangunan Gedung Kantor dan Fasilitas Umum Polda Maluku, Menganalisis penyebab dan dampak yang dapat dilakukan dalam pengendalian biaya untuk mengurangi cost overrun project. Penelitian dilakukan pada Proyek Konstruksi Pembangunan Gedung Kantor dan Fasilitas Umum Polda Maluku. Metode yang digunakan dalam penelitian ini adalah metode kuntitatif, untuk pengumpulan data menggunakan kuisioner penelitian dan dianalisis menggunakan metode statistik SPSS untuk menguji reliabilitas atau validitas data penelitian. Hasil penelitian menujukan penyebab yang dominan dalam faktor risiko pada pengendalian biaya untuk mengurangi cost overrun yaitu tidak mengontrol rencana proyek dan realsisasinya secara real-time, tidak melakukan pencatatan/pembukuan pengeluaran dan pendapatan, tidak membuat integrated cloud untuk mengumpulkan dan menampilkan report, tidak membuat efisiensi penggunaan sumber daya manusia dan operasional proyek, tidak mengelolah cashflow.

The implementation of a construction project is limited by cost, quality and time. Achieving success in a project requires good management with controls that can influence the final results of a project. Good control can reduce the risk of delays and cost overruns. The purpose of this study is to analyze the activities carried out in the process of controlling the costs of the construction project for the construction of the Maluku Regional Police Office Building and Public Facilities, to analyze the risk factors that cause cost overruns in controlling the construction project costs of the Maluku Regional Police Office Building and Public Facilities. carried out in controlling costs to reduce project cost overruns.The research was conducted on the Maluku Regional Police Office Building and Public Facilities Construction Project. The method used in this study is a quantitative method, for data collection using research questionnaires and analyzed using SPSS statistical methods to test the reliability or validity of research data.The results of the study show that the dominant causes of risk factors in cost control to reduce cost overrun are not controlling project plans and their realization in real-time, not recording/booking expenses and income, not creating an integrated cloud to collect and display reports, not making efficiency use of human resources and project operations, not managing cash flow.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Cost Overrun, Pengendalian Biaya Proyek, Proyek Konstruksi, Faktor Risiko Cost Overrun, Project Cost Control, Construction Projects, Risk Factors
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 01 Sep 2025 08:03
Last Modified: 01 Sep 2025 08:03
URI: https://repository.itpln.ac.id/id/eprint/405

Actions (login required)

View Item
View Item