Abstract

Pelepasan beban merupakan kegiatan yang dapat dilakukan untuk menyelamatkan sistem dari kegagalan yang dapat menyebabkan blackout atau mati total. Pelepasan beban dapat dilakukan secara manual atau otomatis. Pelepasan beban secara otomatis dilakukan dalam rangka mengatasi kondisi sistem yang kritis dikarenakan beban berlebih dan frekuensi yang turun. Untuk itu diperlukan suatu sistem yang dapat melepaskan beban secara cepat, tepat dan tidak berlebihan dalam melepaskan beban sehingga sistem dapat diselamatkan dengan cepat. Untuk itu penggunaan Controller C90 yang merupakan perangkat proteksi untuk bay controller dipasang di substation yang jaringannya terdapat beban yang direncanakan untuk masuk dalam skema pelepasan beban. Controller C90 disetting untuk melepaslan beban berdasar skema pelepasan beban yang direncanakan dengan SCADA tanpa perlu memasang setting ke lokasi substation. Saat kondisi kritis frekuensi turun menyentuh angka 49,50 Hz Controller C90 secara otomatis akan melepaskan beban dan informasi alarm serta area yang padam akan tampak pada monitor SCADA. Dengan SCADA pelepasan beban dapat dilakukan mudah dan diseuaikan dengan kebutuhan pengguna.

Load shedding is an activity that can be done to save the system from failure that can cause blackout or total death. Load shedding can be done manually or automatically. It can automatically performed in order to cope with critical system conditions due to overload and down frequency. For that we need a system that can release the load quickly, precisely and not excessive in releasing the load so the system can be saved quickly. For that purpose the use of the C90 Controller which is a protective device for the bay controller is installed on the substation whose network has loads that are planned to enter in the load release scheme. The C90 controller is set to release based on a planned load-out scheme with SCADA without the need to install settings to the substation location. When the critical condition of the frequency drops touched the number 49.50 Hz C90 Controller will automatically release the load and alarm information and the blackout area will be visible on the SCADA monitor. With SCADA the load release can be done easily and customized to the needs of the users.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: SCADA, Controller, Sistem Proteksi, Pelepasan Beban, Load Shedding, Protection Bay Controller. SCADA, Controller, Protection System, Pelepasan Beban, Load Shedding, Protection Bay Controller.
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 26 Nov 2025 12:10
Last Modified: 26 Nov 2025 12:10
URI: https://repository.itpln.ac.id/id/eprint/4110

Actions (login required)

View Item
View Item