Pulau simeulue adalah salah satu pulau di sebelah barat propinsi Aceh. Tepatnya terletak sekitar 150 km sebelah barat pantai sumatera. Pulau Simeulue dengan luas area 2051.48 km2 tersebut saat ini dihuni sekitar 84.933 jiwa (estimasi 2014). Pulau Simeulue terbagi menjadi 8 kecamatan dan 138 desa dengan populasi terbesar terletak di kecamatan Simeulue Timur. Saat ini kelistrikan di Pulau Simeulue ditopang dengan meggunakan diesel generator dengan beban puncak di malam hari berkisar antara 6000 – 7000 KW dan beban puncak di siang hari sebesar 3000 – 3500 KW. Karena Pulau Simeulue masih menggunakan PLTD, sehingga dibutuhkan keberadaan pembangkit lain yang berbiaya lebih murah di sistem Simeulue agar Biaya Pokok Produksi menjadi turun. Pembangkit Listrik Tenaga Surya Photovoltaic (PLTS) adalah salah satu pembangkit energi terbarukan yang saat ini berkembang dengan pesat. Implementasi secara besar-besaran di dunia yang terjadi dalam dekade terakhir ini mengakibatkan keekonomian dari PLTS menjadi semakin kompetitif. Kondisi ini membuka peluang baru bagi dunia kelistrikan nasional dimana teknologi PLTS bisa digunakan untuk memenuhi kebutuhan listrik Indonesia. Terutama di lokasi dimana faktor logistik dan biaya pokok produksi menjadi kendala utama. Diharapkan PLTS akan menjadi salah satu tulang punggung sistem kelistrikan nasional dengan menghasilkan energi listrik yang andal dan ekonomis. Untuk menopang sistem kelistrikan di Pulau Simeulue, akan dibangun PLTS dengan kapasitas awal sebesar 500 kilowatt. PLTS dengan mode operasi On Grid ini akan beroperasi di siang hari dengan tujuan mengurangi konsumsi Bahan Bakar Minyak di sistem Simeulue.
Simeulue is one of the islands located in the western of Aceh. It lies about 150 Km off the western coast of Sumatera. Simeulue had the population of 84.933 at the 2014 (estimate) within the area of 2051.48 km2. It divided into 8 subdistricts and 138 villages with the largest population in Eastern Simeulue. The electricity system in Simeulue Island is currently using Diesel Fired Power Plant with a peak load between 6000-7000 KW in the evening and 3000 - 3500 KW in the day. It condition requires the presence of more efficient power plants to reduce the cost of production. Photovoltaic Solar Power Plant is one of the renewable energy power-station which is growing rapidly in present time. It implementation in the world with large scale occurred in the past decade makes the economics of Solar Power Plant is becoming increasingly competitive. These conditions rise new opportunities for the national electricity sphere because of Solar Power Plant technology can be used to fulfill the electricity needs of Indonesia, especially in the locations where the logistics factors and production cost are the main obstacles. Solar Power Plant is expected to be one of the backbones of the national electricity system in generating reliably and economically electrical energy. Solar Power Plant with an initial capacity of 500 kilowatts will be built in Simeulue in order to sustain the electrical system. On Grid Solar Power-Station will be operated during the day with the aim to reduce the consumption of oil in Simeulue electricity system.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Pulau, Simeulue, PLTS, PLTD. Island, Simeulue, Solar Power Plant, Diesel Fired Power Plant. |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 26 Nov 2025 13:56 |
| Last Modified: | 26 Nov 2025 13:56 |
| URI: | https://repository.itpln.ac.id/id/eprint/4122 |