Jaringan distribusi merupakan bagian dari sistem tenaga listrik yang paling dekat dengan pelanggan dan yang paling banyak mengalami gangguan, Sehingga salah satu masalah utama dalam sistem distribusi adalah mengatasi gangguan yang terjadi, Sebab terjadinya gangguan akan mempengaruhi operasi sistem kerja distribusi, Pada penelitian ini akan dilakukan simulasi suatu model upaya penurunan gangguan jaringan distribusi untuk menurunkan gangguan yang terjadi pada sistem distribusi, khususnya dipenyulang BBS 06 diwilayah PT.PLN (Persero) Rayon Brebes dengan metode inspeksi rutin dan darurat. Dari hasil data rekaman gangguan bulan januari menunjukan terjadinya 2 kali trip pada PMT BBS 06 padahal target dari PT.PLN (Persero) Rayon Brebes dalam satu tahun hanya mengalami 13 Kali Trip. Dalam penelitian ini hanya satu penyulang yang diambil dari wilayah PT.PLN (Persero) Rayon Brebes yaitu penyulang BBS 06 yang termasuk penyulang terpanjang. Hasil dari dilakukannya upaya penurunan gangguan menunjukan bahwa diperoleh hasil untuk penyulang BBS 06 pada bulan februari mengalami 1 kali trip yang disebabkan oleh petir, dan pada bulan maret mengalami 1 kali trip. Hal ini menunjukan bahwa gangguan yang terjadi mengalami penurunan.
Distribution network is part of the power system nearest with customers and the most experiencing disturbances, So one of the main issues in distribution system is overcoming the disorders that happen, Because the occurrence of disturbance will affect operation distribution work system, In this research will be simulated a model of disturbance dish network distribution efforts to reduce disturbance occurred in distribution system. particularly in BBS 06 repeater in area PT.PLN (Persero) Rayon Brebes with routine inspection method and emergency. simulation of this calculation based on the short circuit flow rate from the result of recorded data of january disorders that show 2 trip periods on PMT BBS 06 though target of PT.PLN (Persero) Rayon Brebes in one year only experienced 13 times trip. In this research only one repeater taken from region PT.PLN (Persero) Rayon Brebes namely feeder BBS 06 including longest repeater. results from doing destructive impairment efforts to show that results to reduce BBS 06 in february experiencing 1 trip trip caused by lightning, and in march experiencing 1 trip times. it shows that the disturbance that occurred has decreased.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Sistem distribusi, Gangguan hubung singkat, Trip Distribution System, Short Circuit Interruption, Trip |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 27 Nov 2025 06:14 |
| Last Modified: | 27 Nov 2025 06:14 |
| URI: | https://repository.itpln.ac.id/id/eprint/4148 |