Prakasa, Mochamad Bangkit and Sudibyo, Uno Bintang (2018) STUDI PERENCANAAN KOORDINASI RELE ARUS LEBIH DAN RELE GANGGUAN TANAH DISISI MASUKAN DAN KELUARAN PENYULANG ALFA GARDU INDUK BSD I. Diploma thesis, ITPLN.
1 - Cover Skripsi.pdf
Download (19kB)
2 - Lembar Pengesahan.pdf
Download (446kB)
3 - Lembar Pengesahan Penguji.pdf
Download (508kB)
4 - Pernyataan Keaslian Skripsi.pdf
Download (504kB)
5 - Ucapan Terimakasih.pdf
Download (434kB)
6 - Persetujuan Publikasi.pdf
Download (75kB)
7 - Abstrak.pdf
Download (40kB)
8 - Daftar Isi.pdf
Download (50kB)
9 - Bab 1 - 5 (ISI).pdf
Restricted to Registered users only
Download (918kB)
10 - Daftar Pustaka.pdf
Download (29kB)
11 - Lembar Bimbingan.pdf
Download (768kB)
Abstract
Jaringan tegangan menengah merupakan salah satu bagian dari sistem penyaluran tenaga listrik yang sering mengalami gangguan hubung singkat yang menyebabkan terganggunya penyaluran daya listrik ke konsumen. Untuk itu diperlukan sistem koordinasi proteksi yang mampu meminimalisir waktu dan daerah gangguan yang terjadi. Pada ada skripsi ini akan dikaji perencanaan koordinasi proteksi rele arus lebih dan rele gangguan tanah di sisi masukan dan keluaran penyulang Alfa pada Gardu Induk BSD I. Hasil perhitungan dari setting rele arus lebih disisi masukan dan keluaran didapat nilai TMS = 0,31 dan 0,19 sedangkan rele gangguan tanah disisi masukan dan keluaran didapat nilai TMS = 0,22 dan 0,1.Koordinasi proteksi rele yang dapatkan menunjukan bahwa setting yang terpasang pada Gardu Induk BSD I sesuai dengan syarat proteksi.
Medium voltage network is one part of the power distribution system that often experience short circuit interference which causes disruption of power distribution to the consumer. For that we need a protection coordination system that is able to minimize the time and the disturbance that occurs. In this thesis will be reviewed coordination plan of over current relay and ground fault relay on input and output side of Alfa feeder on BSD I Substation. The calculation result from over current relay setting input and output value obtained TMS value = 0,31 and 0, 19, meanwhile the ground fault relay on the input and output side obtained TMS value = 0,22 and 0,1. Coordination of protection of releasing that get show that setting which attached to Substation BSD I in accordance with requirement of protection.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Koordinasi proteksi, Arus hubung singkat, Proteksi protection coordination, protection, short circuit |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 28 Nov 2025 07:21 |
| Last Modified: | 28 Nov 2025 07:21 |
| URI: | https://repository.itpln.ac.id/id/eprint/4200 |