sutrisno, Tri and Budiman, Masgunarto (2017) PERANCANGAN INSTALASI LISTRIK MESIN POMPA AIR PENDINGIN UTAMA PADA PLTU SURALAYA UNIT 600 MW. Diploma thesis, ITPLN.
SKRIPSI (TRI SUTRISNO 201311142).pdf
Restricted to Registered users only
Download (1MB)
Abstract
PLTU khususnya PLTU Batu bara memegang peran terbesar dalam memproduksi energi listrik dalam sistem interkoneksi Jawa Bali. Salah satu bagian yang penting di PLTU adalah pompa air pendingin utama (Cooling Water Pump) yang mengalirkan air pendingin ke dalam kondensor, pompa air pendingin ini digerakan oleh motor tiga fasa. Motor tiga fasa ini harus dipasang dengan instalasi yang benar dan aman yang sesuai aturan PUIL, agar peralatan – peralatan listrik yang terhubung dengan motor aman dan juga pengguna motor aman dari sentuhan listrik langsung maupun tidak langsung. Apabila instalasi yang dipasang tidak sesuai dengan aturan PUIL maka motor dan instalasinya tidak terjamin aman saat beroprasi, hal ini dapat membahayakan peralatan – peralatan listrik lain dan manusia yang menggunakan motor. Perancangan instalasi motor selaian benar dan aman, rancangan harus mememperhatikan sistem rancangan dan peralatan – peralatan listrik apa saja yang digunakan termasuk memilih sistem kontrol motor yang menggerakan pompa air pendingin. Oleh karena itu, dalam skripsi ini akan dibahas bagaimana perancangan instalasi motor penggerak pompa air pendingin utama yang sesuai dengan aturan PUIL.
Coal fired powerplant has the biggest role in producing electrical energy in interconnection system of Java-Bali. One important part of the steam power plant is the Cooling Water Pump that runs cooling water into the condenser, this cooling water pump is driven by a three phase motor. These three phase motors must be installed properly and securely installed according to the rules of PUIL, so the electrical equipment connected to the motor is safe and also the motor users are safe from direct and indirect electric touch. If the installation is not in suitable with the rules PUIL then the motor and installation is not guaranteed safe during the operation, this may endanger the other electrical equipment and human who use the motor. The design of motor installations is correct and safe, the design should pay attention to the design system and equipment, what electrical equipment is used include selecting control systems of motors that move the cooling water pump. Therefore, in this paper will be discussed how the design of the installation of the main coolant water pump driving motor in accordance with the rules PUIL.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | PLTU, Motor Pompa Air Pendingin, Perancangan Instalasi Listrik steam power plant, cooling water pump, design of electrical installation |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 30 Nov 2025 12:12 |