PERENCANAAN PEMBANGKIT LISTRIK HYBRID TENAGA ANGIN PLTB DAN TENAGA SURYA PLTS OFF-GRID STT-PLN JAKARTA

Utomo, Ega Satriyo and Hafidz, Mohammad (2017) PERENCANAAN PEMBANGKIT LISTRIK HYBRID TENAGA ANGIN PLTB DAN TENAGA SURYA PLTS OFF-GRID STT-PLN JAKARTA. Diploma thesis, ITPLN.

[thumbnail of Cover EGA.pdf] Text
Cover EGA.pdf

Download (71kB)
[thumbnail of 1. (i-xiii) Lampiran Depan.pdf] Text
1. (i-xiii) Lampiran Depan.pdf

Download (184kB)
[thumbnail of 5. (pdf) Ega Satriyo Utomo 2013 - 11 -148.pdf] Text
5. (pdf) Ega Satriyo Utomo 2013 - 11 -148.pdf
Restricted to Registered users only

Download (1MB)
[thumbnail of 2. A. Daftar Riwayat Hidup.pdf] Text
2. A. Daftar Riwayat Hidup.pdf

Download (63kB)

Abstract

Semakin berkembangnya suatu daerah, maka kebutuhan energinya juga akan semakin besar karena perkembangan kebutuhan energi berbanding lurus dengan perkembangan teknologi. Semakin berkembangnya teknologi membuat kebutuhan masyarakat akanenergi listrikpun semakin meningkat. Hal tersebut menunjukan bahwa energi listrik bisa dikatakan sebagai salah satu kebutuhan bagi masyarakat modern saat ini. Pembangkit Listrik Tenaga Angin/Bayu (PLTB) dan Pembangkit Listrik Tenaga Surya (PLTS) merupakan salah satu energi alternatif terbarukan yang memiliki potensi cukup tinggi namun belum banyak untuk di gunakan. Dengan kecepatan angin rata-rata 4m/s di Indonesia, PLTB seharusnya dapat di bangun dengan baik. Provinsi DKI Jakarta juga memiliki potensi pembangunan PLTB walaupun tidak sebesar provinsi-provinsi bagian timur yang memiliki kecepatan angin rata-rata lebih tinggi. Dan dengan radiasi matahari yang mencapai 5,50(kWh/m2 /day). Daya keluaran yang dihasilkan oleh PLTB nantinya akan dikoneksikan dengan daya keluaran yang dihasilkan oleh PLTS Off-Grid sehingga kedua pembangkit tersebut akan terkoneksi dengan sistem hibrid. Sehigga daya output yang dihasilkan dapat mencukupi kebutuhan beban di Portacamp STT-PLN.

The development of an area, the energy needs will also be greater because the development of energy needs is directly proportional to the development of technology. The development of technology makes the community's need for energy and electricity increases. It shows that electrical energy can be regarded as one of the needs for modern society today. Wind Power / Bayu (PLTB) and Solar Power (PLTS) is one of the renewable alternative energy that has high potential but not yet much to use. With an average wind speed of 4m / s in Indonesia, PLTBs should be well built. The province of DKI Jakarta also has the potential to develop the PLTB although not as big as the eastern provinces which have higher average wind speed. And with solar radiation reaching 5.50 (kWh / m2 / day). The output power generated by the PLTB will be connected to the output power generated by the Off-Grid PLTS so that the two plants will be connected to the hybrid system. The resulting output power can meet the load requirements of the STT-PLN Portacamp.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: PLTB, PLTS, Sistem Hibrid PLTB, PLTS, Hybrid System
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 30 Nov 2025 14:58
Last Modified: 30 Nov 2025 14:58
URI: https://repository.itpln.ac.id/id/eprint/4218

Actions (login required)

View Item
View Item