PT Pembangkit Jawa Bali (PJB) merupakan salah satu anak perusahaan pembangkit PT Perusahaan Listrik Negara (PLN) yang bergerak di bidang pembangkit tenaga listrik. Pada PT PJB Unit Pembangkit Muara Karang (UP MKR) terbagi menjadi 3 blok pembangkit yang terdiri dari 2 unit Pembangkit Listrik Tenaga Uap (PLTU) dan 5 Pembangkit Listrik Tenaga Gas Uap (PLTGU). Sehubungan dengan keselamatan unit pembangkit, sistem ketenagalistrikan di unit pembangkit pada beberapa titik tidak boleh terputus dari aliran listrik, bahkan pada kondisi Black Out. Hal ini bertujuan untuk menghindari kerusakan yang berat pada turbin dan generator akibat kehilangan pelumasan. Agar semua sistem pelumasan pada bearing-bearing tetap beropersi maka diperlukanlah suatu sistem penyedia daya darurat yang handal dan mampu menunjang kebutuhan seluruh beban darurat yang ada di dalamnya, maka diperlukan adanya sistem penyedia daya tak putus (Uninterruptible Power Supply) untuk beban yang tidak boleh putus pasokan listriknya. Pada penelitian ini penulis merasa perlu adanya penelitian mengenai kehandalan sistem penyedia daya tak putus untuk mengetahui bagaimana sistem penyedia daya tak putus yang ada di PLTU pada PT PJB Unit Pembangkit Muara Karang (UP MKR).
PT Pembangkit Jawa Bali (PJB) is one of the subsidiary of PT Perusahaan Listrik Negara (PLN) which is engaged in power plant. PT PJB Muara Karang Power Plant Unit (UP MKR) is divided into 3 power plant blocks consisting of 2 units of Steam Power Plant (PLTU) and 5 Steam Gas Power Plant (PLTGU). For the safety, at some point, the electricity system of generating unit should not be disconnected from the flow of electricity, even under Black Out conditions. This aims to avoid heavy damage to turbines and generators due to loss of lubrication. In order for all lubrication systems in bearings keep working, they need a reliable emergency power supply system that capable of supporting the needs of all emergency loads. So, it is necessary to have an Uninterruptible Power Supply system for unbreakable loads power supplies. In this study, the author needs to do a research on the reliability of uniterruptible power supply system in order to find out how uniterruptible power supply system PLTU works at PT PJB Muara Karang Power Plant Unit (UP MKR).
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | UPS (Uninterruptible Power Supply) UPS (Uninterruptible Power Supply) |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 01 Dec 2025 04:38 |
| Last Modified: | 01 Dec 2025 04:38 |