PERHITUNGAN ARUS HUBUNG SINGKAT UNTUK MENGANALISIS KAPASITAS PEMUTUS TENAGA DI GARDU INDUK CENGKARENG

Rasyid, Rizal Harun Al and Diantari, Retno Aita (2017) PERHITUNGAN ARUS HUBUNG SINGKAT UNTUK MENGANALISIS KAPASITAS PEMUTUS TENAGA DI GARDU INDUK CENGKARENG. Diploma thesis, ITPLN.

[thumbnail of SKRIPSI.pdf] Text
SKRIPSI.pdf
Restricted to Registered users only

Download (2MB)

Abstract

Gangguan pada sistem tenaga listrik umumnya adalah gangguan hubung singkat. Jenis gangguan hubung singkat adalah gangguan hubung singkat antar fasa dan gangguan hubung singkat fasa ke tanah. Akibat yang ditimbulkan dari gangguan hubung singkat bisa berupa gangguan sementara maupun gangguan permanen yang merusak peralatan baik secara thermis maupun mekanis. Arus hubung singkat dapat dihilangkan ketika pemutus tenaga terbuka. Pada sistem proteksi di Gardu Induk telah didesain dengan sangat baik untuk mengantisipasi terjadinya gangguan. Hal ini dimaksudkan agar sistem tetap handal ketika terjadi gangguan tidak sampai terjadi padam maupun gangguan meluas ke area yang lainnya. Penentuan kapasitas pemutus tenaga harus berdasarkan nilai arus hubung singkat terbesar yang mungkin terjadi. Nilai arus hubung singkat terbesar yang didapatkan untuk arus gangguan 1 fasa ke tanah adalah 16 kA dan 21 kA untuk arus hubung singkat 3 fasa sedangkan kapasitas pemutusan arus gangguan pada pemutus tenaga yang terpasang masih jauh lebih besar jika dibanding arus gangguan yang terjadi yaitu sebesar 50 kA. Oleh karena itu pemutus tenaga yang terpasang masih memenuhi persyaratan sistem proteksi yang baik dan handal.

The disturbance in the electric power system is generally a short circuit. The type of short-circuit interference is short circuit between phase and short circuit of phase to ground. The consequences of short-circuit interference may be temporary disturbances or permanent disturbances that damage equipment both thermally and mechanically. Short circuiting currents can be removed when the circuit breaker is open. In the system of protection in the substation has been designed very well to anticipate the occurrence of interference. This is intended to keep the system reliable when the interruption does not occur until the outages or disruption extends to other areas. Determining the capacity of the circuit breaker shall be based on the largest possible short circuit current value. The largest short-circuit current value obtained for the phase to the ground current is 16 kA and 21 kA for 3 phase short circuit current while the interrupting current interruption capacity at the power breaker is still much greater than the current disturbance that is 50 kA . Therefore, the installed power circuit breakers still meet the requirements of a good and reliable protection system.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: gangguan sistem tenaga listrik, hubung singkat, gardu induk, pemutus tenaga, kehandalan power system disturbance, short circuit, substation, circuit breaker, reliability
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 02 Dec 2025 05:35
Last Modified: 02 Dec 2025 05:35
URI: https://repository.itpln.ac.id/id/eprint/4306