SILABAN, YOSEP ERJUANDI and Willy, Purnomo (2017) ANALISIS OVER CURRENT RELAY PADA TRANSFORMATOR PEMAKAIAN SENDIRI 20/6,3 Kv ; 40 MVA DI PLTU UJP BANTEN 3 LONTAR UNIT 1. Diploma thesis, ITPLN.
LEMBAR TAMBAHAN (JUDUL,DLL).pdf
Download (383kB)
BAB I.pdf
Download (161kB)
BAB II.pdf
Download (1MB)
BAB III.pdf
Restricted to Registered users only
Download (718kB)
BAB IV.pdf
Restricted to Registered users only
Download (570kB)
BAB V.pdf
Restricted to Registered users only
Download (263kB)
Abstract
Sistem tenaga listrik terutama pembangkit mempunyai fungsi untuk memenuhi kebutuhan listrik masyarakat secara terus-menerus. Guna menjaga kelangsungan saluran tenaga listrik maka diperlukan sebuah alat proteksi . Trafo pemakaian sendiri merupakan salah satu komponen penting dalam instalasi pemakaian sendiri di pusat pembangkit tenaga listrik. Transformator daya pemakaian sendiri beroperasi sebagai penyalur tegangan menengah untuk peralatan pembangkit setelah unit pembangkit mulai dibebani, yang dimana dayanya diperoleh langsung dari generator. Untuk menunjang keberlangsung sistem pembangkitan tenaga listrik, di perlukan proteksi yang andal. Oleh karena itu, rele arus lebih diperlukan untuk mencegah kerusakan lebih pada peralatan yang disebabkan adanya gangguan seperti gangguan hubung singkat. Metode yang digunakan pada penelitian ini adalah metode studi pustaka, metode wawancara dan metode observasi, pengumpulan dan analisa data. Setelan rele differensial secara perhitungan adalah 3,971 A sedangkan hasil pengujian 5,09 A.
The electrical power system, especially the power plant, has a function to continuously fulfill electricity demand. To maintain the continuity of electrical power supply, a protection tool is needed. Unit auxiliary transformer is one of the important components of unit auxiliary installation in the electrical power plant centre. Unit auxiliary transformer operates as medium voltage feeder for the generation auxiliary tools after the plant unit is loaded, whereas the power is gained from the generator. To support the continuity of electrical power generation system, reliable protection is needed. Therefore, over current relay is needed even more to prevent more damages over the generation auxiliary tools that is caused by failures such as short circuit failure. Methods used in this thesis are literature review, interview and observation, as well as data collection and analysis. The calculation of over current relay setting is 3.971 A, while 5.09 A is the test result.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Rele arus lebih, gangguan hubung singkat, trafo pemakaian sendiri. Over Current Relay, Short Circuit Failure, Unit Auxiliary Transformer |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 05 Dec 2025 03:50 |
| Last Modified: | 05 Dec 2025 03:50 |
| URI: | https://repository.itpln.ac.id/id/eprint/4425 |