Gultom, Surya Budi and Sudibyo, Uno Bintang (2018) PERANCANGAN PENGGUNAAN PLTS ON GRID PADA GUDANG PENYIMPANAN TEMPAT PELELANGAN IKAN MUARA ANGKE. Diploma thesis, ITPLN.
Cover.pdf
Download (55kB)
Judul - Daftar Isi.pdf
Download (96kB)
BAB I.pdf
Download (40kB)
BAB II.pdf
Download (315kB)
BAB III.pdf
Restricted to Registered users only
Download (223kB)
BAB IV.pdf
Restricted to Registered users only
Download (799kB)
BAB V.pdf
Restricted to Registered users only
Download (11kB)
Daftar Pustaka.pdf
Download (31kB)
DAFTAR RIWAYAT HIDUP.pdf
Download (39kB)
LEMBAR LAMPIRAN.pdf
Download (456kB)
Abstract
Energi matahari tersedia dalam jumlah yang sangat besar, tidak bersifat polutif, tidak akan habis namun gratis, maka dari itu sumber energi ini dimanfaatkan untuk kelistrikan melalui sistem Pembangkit Listrik Tenaga Surya, terutama untuk memasok listrik daerah pesisir Indonesia yang sulit dijangkau oleh PLN. Skripsi ini akan membahas perancangan sistem PLTS On Grid dengan beban berupa sebuah gudang penyimpanan tempat pelelangan ikan muara angke. PLTS ini dirancang untuk mensuplai pasokan listrik dengan perkiraan kebutuhan beban energi sekitar 125 kWp, menggantikan penggunaan generator diesel. Dalam merancang PLTS On Grid penulis menggunakan aplikasi PVsyst, yang dimana untuk menentukan Performance Ratio (PR) dalam sistem PLTS sebagai acuan bahwa sistem ini layak direalisasikan dengan nilai PR 80.1%. Dengan memperhitungkan aspek ekonomi maka diperoleh perhitungan Net Present Value (NPV) adalah Rp 398.725 dan Provitability Index (PI) dengan nilai 1,0002.
Solar energy is an energy available in very large quantities, not polutif, will not be exhausted but free, therefore the energy source is utilized for electricity tusing Solar Power System, especially to supply the coastal area of Indonesia that is difficult to reach by PLN. In this thesis the design of PV Solar Power Plan On Grid system with the burden of a storage warehouse where auction estuary fish angke. The PV Solar Power Plan is designed to supply power supplies with an estimated energy load requirement of around 125 kWp, replacing the use of diesel generators. In designing PV Solar Power Plan On Grid the author uses PVsyst application, which is where to determine the Performance Ratio (PR) in the PV Solar Power Plan system as a reference that the system is feasible to be realized with a PR value of 80.1%. Taking into account the economic aspect, the Net Present Value (NPV) is calculated is Rp 398.725 and the Provitability Index (PI) with a value of 1,0002.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | PLTS On Grid, Performa Ratio, Net Present Value, Provitability Index, tempat pelelangan ikan PV Solar Power Plan On Grid, Performance Ratio, Net Present Value, Provitability Index, Fish Auction |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 05 Dec 2025 07:23 |
| Last Modified: | 05 Dec 2025 07:23 |
| URI: | https://repository.itpln.ac.id/id/eprint/4437 |
