ANALISIS PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN STRUKTUR PELAT LANTAI DENGAN METODE KONVENSIONAL DAN HALF SLAB (STUDI KASUS: PROYEK PEMBANGUNAN APARTEMEN TOKYO RIVERSIDE TOWER 7 - PIK 2, TANGERANG)

Andifa, Rizki and Hastanto, Hastanto (2021) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN STRUKTUR PELAT LANTAI DENGAN METODE KONVENSIONAL DAN HALF SLAB (STUDI KASUS: PROYEK PEMBANGUNAN APARTEMEN TOKYO RIVERSIDE TOWER 7 - PIK 2, TANGERANG). Diploma thesis, ITPLN.

[thumbnail of Rizki Andifa_201721017.pdf] Text
Rizki Andifa_201721017.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

Perkembangan dalam bidang industri konstruksi di Indonesia setiap tahunnya terus berkembang menyebabkan semakin banyaknya perusahaan konstruksi di Indonesia untuk dapat memenangkan persaingan. Karena itu maka para perencanaan konstruksi juga terus melakukan perkembangan pada metode pelaksanaan suatu konstruksi. Perkembangan dalam metode pelaksanaan suatu konstruksi ditujukan untuk mencapai biaya yang seekonomis mungkin dan mutu yang tingi agar dapat bersaing dengan cara memangkas durasi waktu pelaksanaan, dan juga mengurangi jumlah tenaga kerja yang digunakan. Pada penelitian ini akan dilakukan perbandingan metode pekerjaan pelat lantai konvensional dan half slab pada Proyek Pembangunan Apartemen Tokyo Riverside dari segi waktu dan biaya. Dalam penelitian ini analisis biaya mengacu pada SNI – 7832 – 2017 dan analisa perhitungan dari data dilapangan. Adapun hasil analisis perbandingan 2 metode kerja half slab dan konvensional didapatkan hasil untuk metode half slab membutuhkan waktu pelaksanaan 55,57 hari dengan biaya sebesar Rp5.816.499.551 sedangkan konvensional membutuhkan waktu pelaksanaan 58,34 hari dengan biaya Rp7.989.274.360.

Developments in the construction industry in Indonesia continue to grow every year causing more and more construction companies in Indonesia to be able to win the competition. Therefore, construction planners also continue to make developments on the method of implementing a construction. Developments in the method of implementing a construction are aimed at achieving the most economical possible cost and high quality in order to be competitive by reducing the duration of execution time, and also reducing the amount of labor used. In this study, a comparison of conventional floor and work methods will be carried half slab in the Apartment Development Project Tokyo Riverside out in terms of time and cost. In this study, the cost analysis refers to SNI – 7832 – 2017 and analysis of calculations from data in the field. The results of a comparative analysis of two working methods half slab of conventional and obtained results for method the half slab execution takes 55.57 days at a cost of Rp5.816.499.551 whereas conventional implementation takes 58.34 days and cost Rp7.989.274.360.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: perbandingan biaya dan waktu, pelat metode konvensional, half slab cost and time comparison, conventional plate method, half slab
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 02 Sep 2025 07:53
Last Modified: 02 Sep 2025 07:53
URI: https://repository.itpln.ac.id/id/eprint/445

Actions (login required)

View Item
View Item