“SWITCH JOINT OLS” PADA IBT 123 UNGARAN SEBAGAI SOLUSI PENCEGAHAN BLACKOUT PADA SUBSISTEM JAWA TENGAH DAN DIY

Fahreza, Muhammad Andrew and Widyastuti, Christine (2025) “SWITCH JOINT OLS” PADA IBT 123 UNGARAN SEBAGAI SOLUSI PENCEGAHAN BLACKOUT PADA SUBSISTEM JAWA TENGAH DAN DIY. Diploma thesis, ITPLN.

[thumbnail of TA_MUHAMMAD ANDREW FAHREZA _202271592.pdf] Text
TA_MUHAMMAD ANDREW FAHREZA _202271592.pdf
Restricted to Registered users only

Download (3MB)

Abstract

Keberadaan listrik merupakan keniscayaan di masa kini, hampir semua sendi kehidupan bergerak dengan energi listrik. Pemadaman listrik atau blackout adalah suatu kondisi yang sangat tidak diinginkan oleh seluruh insan PLN. Dan secara korporasi PT.PLN (Persero) terus menggalakan transformasi 2.0 moonshot yang salah satu fokus pada Growth Moonshot adalah komitmen anti Blackout. Pada 30 Mei tahun 2022 telah terjadi blackout pada SS Ungaran akibat Trip IBT 1-2 Ungaran, yang berakibat memadamkan 31 GI, dengan total beban padam sebesar 1060,49 MW, dan Energy Not Served (ENS) 4454,68 MWH. Gangguan tersebut berada pada wilayah kerja PLN UP2B Jateng & DIY sebagai Unit Pelaksana Pengatur Beban di bawah Unit Induk Pusat Pengatur Beban (UIP2B). Sebagai langkah mitigasi terkait keandalan yang dapat dilakukan untuk mencegah terjadinya blackout pada SS Ungaran adalah inisiasi pembangkitan PLTGU Tambaklorok sebesar 425 MW dan pemasangan skema pertahanan sistem (Defense Scheme). Adapun Defense Scheme yang telah diterapkan di UP2B Jawa Tengah & DIY diantaranya OLS, OGS, UFLS dan skema Islanding. Namun, Desain skema OLS hanya memperhatikan konfigurasi normal sehingga pada saat terjadi perubahan konfigurasi jaringan atau penggabungan subsistem (looping), menyebabkan skema yang di desain tidak dapat bekerja sempurna. Penggabungan subsistem melalui IBT menyebabkan skema target yang terpasang bekerja sendiri-sendiri. Pada kondisi kontingensi tertentu berpotensi terjadi pembebanan lebih pada IBT yang dapat berakibat trip sehingga menimbulkan pemadaman meluasa atau Blackout. Untuk menjawab permasalahan itu maka diimplementasikan Switch Joint OLS sebagai metode joint skema OLS IBT 1-2 Ungaran dan IBT 3 Ungaran guna mencegah blackout saat terjadi gangguan akibat looping subsistem dan dapat mengurangi kerugian dikarenakan Energy Not Served (ENS). Melalui Switch Joint OLS diharapkan menjadi solusi efektif dan andal sebagai bagian dari program Anti Blackout yang terus digaungkan PT.PLN (Persero).

The presence of electricity is an absolute necessity in today’s world, as nearly all aspects of life operate using electrical energy. Power outages or blackouts are highly undesirable events for all PLN personnel. At the corporate level, PT PLN (Persero) continues to promote its Transformation 2.0 Moonshot, with one of the key focuses under the Growth Moonshot being a strong commitment to the Anti-Blackout initiative. On May 30, 2022, a blackout occurred at SS Ungaran due to the tripping of IBT 1-2 Ungaran, which resulted in the outage of 31 substations (GI), with a total load loss of 1,060.49 MW and an Energy Not Supplied (ENS) of 4,454.68 MWh. This incident occurred within the operational area of PLN UP2B Central Java & Yogyakarta (Jateng & DIY), which functions as the Load Dispatching Unit under the Central Load Control Unit (UIP2B). As a mitigation measure to ensure reliability and prevent future blackouts at SS Ungaran, PLN initiated the operation of the Tambaklorok CCGT Power Plant (PLTGU Tambaklorok) with a generation capacity of 425 MW, along with the installation of system defense schemes. The defense schemes implemented at UP2B Central Java & Yogyakarta include OLS (Overload Shedding), OGS (Over Generation Shedding), UFLS (Under Frequency Load Shedding), and islanding schemes. However, the current OLS scheme was designed based only on the normal network configuration. Therefore, when there is a change in network configuration or subsystem interconnection (looping), the designed scheme may not function properly. Subsystem interconnection through IBTs causes the individual OLS schemes to operate independently. Under certain contingency conditions, this could lead to excessive loading on the IBT, potentially resulting in a trip and causing widespread outages or blackouts. To addressthisissue, the Switch Joint OLS wasimplemented as a method to integrate the OLS schemes of IBT 1-2 Ungaran and IBT 3 Ungaran. This integration aims to prevent blackouts during disturbances caused by subsystem looping and to reduce energy losses due to Energy Not Served (ENS). The Switch Joint OLS is expected to serve as an effective and reliable solution, reinforcing the Anti-Blackout program continuously promoted by PT PLN (Persero).

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Growth Moonshoot, Anti Blackout, Defence Scheme. Growth Moonshot, Anti-Blackout, Defense Scheme, Switch Joint OLS
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Vokasi > D3 Teknologi Listrik
Depositing User: Sudarman
Date Deposited: 08 Dec 2025 04:19
Last Modified: 08 Dec 2025 04:19
URI: https://repository.itpln.ac.id/id/eprint/4464

Actions (login required)

View Item
View Item