Setiawan, Heru and Pahiyanti, Novi Gusti (2018) CAPACITORS INSTALLATION ANALYSIS ON PRIMARY DISTRIBUTION OF INDUSTRIAL CUSTOMERS TO IMPROVE THE POWER FACTOR. Diploma thesis, ITPLN.
1. COVER.pdf
Download (39kB)
2. LEMBAR PENGESAHAN.pdf
Download (136kB)
3. LEMBAR PENGESAHAN TIM PENGUJI.pdf
Download (146kB)
4. SURAT PERNYATAAN KEASLIAN SKRIPSI.pdf
Download (155kB)
5. UCAPAN TERIMA KASIH.pdf
Download (149kB)
6. HALAMAN PERNYATAAN PERSETUJUAN PUBLIKASI.pdf
Download (183kB)
7. ABSTRAK INDONESIA.pdf
Download (330kB)
8. ABSTRAK INGGRIS.pdf
Download (225kB)
9. DAFTAR ISI.pdf
Download (253kB)
10. DAFTAR TABEL.pdf
Download (283kB)
11. DAFTAR GAMBAR.pdf
Download (147kB)
12. DAFTAR LAMPIRAN.pdf
Download (144kB)
13. BAB I.pdf
Download (377kB)
14. BAB II.pdf
Download (569kB)
15. BAB III.pdf
Restricted to Registered users only
Download (164kB)
16. BAB IV.pdf
Restricted to Registered users only
Download (500kB)
17. BAB V.pdf
Restricted to Registered users only
Download (147kB)
18. DAFTAR PUSTAKA.pdf
Download (179kB)
19. DAFTAR RIWAYAT HIDUP.pdf
Download (149kB)
20. LAMPIRAN A.pdf
Download (179kB)
21. LAMPIRAN B.pdf
Download (146kB)
Abstract
Dalam proses penyaluran energi listrik, kita ketahui bahwa untuk pelanggan PLN dengan jenis tarif I2, I3, dan I4 dalam pemakaian listriknya dikenai biaya pemakaian kWH dan pemakaian kVARh setiap bulannya. Untuk pelanggan dengan jenis tarif I, beban selalu bersifat induktif disebabkan karena peralatan – peralatan listrik digunakan selalu menyerap kVARh. Apabila makin besar nilai PF, maka makin kecil nilai kVARh sehingga biaya pemakaian kVARh semakin kecil. Pelanggan – pelanggan PLN dengan kategori tarif industri dikenakan biaya kelebihan kVARh - nya apabila PF < 0,85 lagging. Untuk pemakaian kVARh dengan PF 0,85 keatas, pelanggan tidak dikenai biaya. Untuk itu dalam usaha menekan biaya kVARh beberapa pelanggan berusaha menaikkan nilai PF menjadi ≥ 0,85 lagging. Pada skripsi ini akan membahas analisa pemasangan kapasitor pada pelanggan industri, dan penelitian ini dilakukan di PT. A yang bergerak dibidang produksi dan distribusi baja, PT. A dikenai denda kVARh karena nilai nilai kelebihan kVARh selama 3 bulan sudah melebihi 62% dari ketentuan daya kVAR nya, oleh karena itu dilakukan perhitungan besar kapasitas kapasitor yang dibutuhkan sekaligus menghitung pengaruhnya terhadap perbaikan tegangan yang didapat dari data rekening listrik PLN. Hasil perhitungan dan analisa, maka ditetapkan untuk perbaikan power factor pada operasi PT. A menjadi sebesar 0,85 lagging perlu dipasang kapasitor 100 kVAR.
In the process of electric power distribution, we know that for PLN customers with type of I2, I3, and I4 tariffs in its electricity usage is charged kWH usage and kVARh usage every month. For customers with the type of tariff I, the load is always inductive because electrical equipment used always absorbs kVARh. If the greater the value of PF, the smaller the value kVARh so that the cost of usage kVARh the smaller. PLN customers with an industry tariff category are subject to their excess kVARh charge if PF <0.85 lagging. For use of kVARh with PF 0.85 and above, subscribers are not charged. For that in an effort to reduce the cost of kVARh some customers try to raise the value of PF to ≥ 0.85 lagging. In this thesis will discuss the analysis of capacitor mounting on industrial customers, and this research was done in PT. A engaged in the production and distribution of steel, PT. A is subject to a kVARh fine because the value of kVARh excess value for 3 months already exceeds 62% of its kVAR power requirement, therefore a large calculation of capacitor capacity is required as well as calculating its effect on the voltage improvement obtained from the PLN electricity account data. The results of calculations and analysis, then set for improvement of power factor on the operation of PT. A to 0.85 lagging need to be installed 100 kVAR
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Induktif, Tarif Industri, Perbaikan Faktor Daya, Kapasitor. Inductive, Industrial rates, power factor improvement, capacitors |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 15 Dec 2025 14:32 |
| Last Modified: | 15 Dec 2025 14:32 |
| URI: | https://repository.itpln.ac.id/id/eprint/4618 |
