Anharini, Muthia and Kustantrika, Irma Wirantina (2021) ANALISIS PRODUKTIVITAS PEKERJA DENGAN METODE TIME STUDY PADA PEKERJAAN KOLOM PROYEK PEMBANGUNAN JALUR KERETA API BANDARA YOGYAKARTA INTERNATIONAL AIRPORT. Diploma thesis, ITPLN.
![[thumbnail of MUTHIA ANHARINI 201721070.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
MUTHIA ANHARINI 201721070.pdf
Restricted to Repository staff only
Download (2MB)
Abstract
Produktivitas pekerja diperlukan untuk menunjang keberhasilan sebuah proyek konstruksi. Dengan produktivitas pekerja yang baik, berdampak pada kesesuaian perencanaan jadwal konstruksi. Pada penelitian dilakukan analisis produktivitas pekerja, yang akan dihitung merupakan produktivitas pekerja pekerjaan kolom pada Proyek Pembangunan Jalur Kereta Api Bandara Yogyakarta International Airport yang di hitung dengan menggunakan metode time study. Dari hasil analisa dapat disimpulkan beberapa hal, yaitu nilai rata-rata standard time pada pekerjaan penulangan kolom pada titik P37A dengan ketinggian 7,6 m yang memiliki volume sebesar 5142 kg adalah 772,86 menit, pekerjaan penulangan kolom pada titik P37 dengan ketinggian 6,88 m yang memiliki volume sebesar 4707,90 kg adalah 750,56 menit. Pekerjaan pemasangan bekisting kolom dengan volume 8,62 m2 adalah 346,52 menit. Pekerjaan pengecoran kolom pada titik P37A dengan dengan volume 10 m3 adalah 28,36 menit, pekerjaan penulangan kolom pada titik P37 dengan dengan volume 9 m3 adalah 20,79 menit. Nilai rata rata produktivitas pada pekerjaan penulangan kolom adalah 343,31 kg/OH. Pekerjaan bekisting kolom adalah 3,01 m2 /OH. Pekerjaan pengecoran kolom adalah 63 m3/OH. Faktor-faktor yang mempengaruhi produktivitas pekerja pekerjaan kolom yaitu jumlah pekerja, produktivitas akan lebih besar dengan jumlah pekerja lebih sedikit, faktor dari lokasi antar material dan lokasi pengerjaan dan faktor alat/mesin yang digunakan jika terkendala menyebabkan produktivitas rendah.
Worker productivity is needed to support the success of a construction project. Good worker productivity has an impact on the suitability of the construction schedule planning. In this study, an analysis of worker productivity will be calculated as the productivity of column workers in the Yogyakarta International Airport Railway Construction Project which is calculated using the time study method. From the results of the analysis, it can be concluded several things, the average standard time for installing column reinforcement at location P37A with a height of 7.6 m which has a volume of 5142 kg is 772.86 minutes, installation of column reinforcement at location P37 with a height of 6.88 m which has a volume of 4707.90 kg is 750.56 minutes. The work of installing column formwork with a volume of 8.62 m2 is 346.52 minutes. Column casting work at location P37A with a volume of 10 m3 is 28.36 minutes, column reinforcement work at location P37 with a volume of 9 m3 is 20.79 minutes. The average value of productivity in the installation of column reinforcement is 343.31 kg/OH. Column formwork work is 3.01 m2 /OH. Column casting work is 63 m3/OH. Factors that affect worker productivity are the number of workers, productivity will be greater with fewer workers, the factor of the location between the material and the work location, and the factor of tools/machines used if constrained, causing low productivity.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Produktivitas, Metode Time Study, Kolom Productivity, Time Study Method, Column |
Subjects: | Bidang Keilmuan > Teknik Sipil |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 02 Sep 2025 14:27 |
Last Modified: | 02 Sep 2025 14:27 |
URI: | https://repository.itpln.ac.id/id/eprint/465 |