Berlian, Nancy and Hastanto, Hastanto (2021) OPTIMASI BIAYA DAN WAKTU PENYELESAIAN PROYEK DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN GARDU INDUK 150 KV SEKOTONG. Diploma thesis, ITPLN.
![[thumbnail of NANCY BERLIAN_201721066.pdf]](https://repository.itpln.ac.id/style/images/fileicons/text.png)
NANCY BERLIAN_201721066.pdf
Restricted to Repository staff only
Download (3MB)
Abstract
manajemen proyek ialah meliputi persiapan, pelaksanaan, kontrol, dan pengoordinasian proyek dari mulai hingga selesainya proyek guna memastikan pelaksanaan proyek tepat biaya, mutu dan waktu. Waktu dan biaya dianggap sebagai hal terpenting untuk dipertimbangkan untuk perencanaan proyek yang efisien. Oleh karena itu, kepentingan biaya dan waktu terlihat jelas dalam optimalisasi waktu dan biaya proyek konstruksi. Pengoptimalan biaya dapat didefinisikan sebagai pengurangan biaya yang diberikan tanpa merusak kesesuaiannnya untuk penggunaan yang direncanakan. Banyak cara dan teknik untuk mengoptimalkan dan mengendalikan proyek dimana banyak proyek konstruksi yang tidak dapat mencapai tujuannya mengingat waktu dan biaya. Analisa dari proses pengomptimalan wakatu dan biaya pelaksanaan proyek dengan melakukan pengurangan durasi proyek yang dilakukan pada kegiatan kerja yang berada di lintasan kritis dengan sebutan Time Cost Trade Off (Pertukaran waktu dan biaya). Dengan menggunakan dua metode penambahan tenaga kerja dan penambahan jam kerja lalu dibandingkan untuk mencari waktu dan biaya optimal dalam kegiatan proyek pekerjaan pembangunan gardu induk sekotong.
Project management includes the preparation, implementation, control, and coordination of projects from start to completion of the project in order to ensure the implementation of the project at the right cost, quality and time. Time and cost are considered as the most important things to consider for efficient project planning. Therefore, the importance of cost and time is clearly visible in optimizing the time and cost of a construction project. Cost optimization can be defined as a given cost reduction without compromising its suitability for its intended use. There are many ways and techniques to optimize and control projects where many construction projects cannot achieve their goals given the time and cost. Analysis of the process of optimizing the time and cost of project implementation by reducing the duration of the project carried out on work activities that are on a critical trajectory called the Time Cost Trade Off (Exchange of time and costs). By using two methods of adding labor and additional working hours then compared to find the optimal time and cost in project activities for the construction of the Sekotong substation.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Optimasi, Trade Off, Time Cost Optimization, Trade Off, Time Cost |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |