STUDI PENENTUAN SUDUT PENYALAAN SISI KONVERTER DAN SISI INVERTER PADA SISTEM SALURAN INTERKONEKSI 500 KV HVDC SUMATERA – JAWA

NOVIKA, KARDIANTO and Sampurno, Sampurno (2015) STUDI PENENTUAN SUDUT PENYALAAN SISI KONVERTER DAN SISI INVERTER PADA SISTEM SALURAN INTERKONEKSI 500 KV HVDC SUMATERA – JAWA. Diploma thesis, ITPLN.

[thumbnail of Abstrak dan daftar isi.pdf] Text
Abstrak dan daftar isi.pdf

Download (330kB)
[thumbnail of Studi Penentuan Sudut Penyelaan Sisi Konverter dan Sisi Inverter Saluran Interkoneksi HVDC 500kV Sumatera-.pdf] Text
Studi Penentuan Sudut Penyelaan Sisi Konverter dan Sisi Inverter Saluran Interkoneksi HVDC 500kV Sumatera-.pdf
Restricted to Registered users only

Download (2MB)
[thumbnail of 1B17 131217 HVDC P1 BD_B SC6 400 Drawings.pdf] Text
1B17 131217 HVDC P1 BD_B SC6 400 Drawings.pdf

Download (752kB)

Abstract

Kebutuhan energi Indonesia, salah satunya energi listrik saat ini terpusat di Jawa-Bali dengan komposisi 76,3% dan sisanya sekitar 23,7% di luar Jawa-Bali. (PLN Statistik 2008). Untuk memenuhi kebutuhan listrik sistem Jawa-Bali ke depan, sebagian besar akan disuplai dengan PLTU berbahan bakar batubara yang direncanakan sebagian besar akan dibangun di Pulau Sumatera Selatan (PLTU Mulut tambang). Saat ini telah ada teknologi penyaluran energi listrik dengan Transmisi HVDC (High Voltage Direct Current) yang secara teknis dapat mengirimkan energi listrik dalam kapasitas besar dan jarak jauh. Dengan begitu, kita tidak perlu lagi harus membangun pembangkit di dekat pusat beban (Pulau Jawa), dan memungkinkan untuk membangun pembangkit di mulut tambang (Sumatera atau Kalimantan) dan mengirimkan energi listriknya ke Pulau Jawa. Sehingga hanya butuh satu kali investasi di awal saja untuk membangun Jaringan Transmisinya dan dapat beroperasi selama 30 tahun hanya dengan mengeluarkan biaya operasionalnya. Ada beberapa paket yang harus dikerjakan untuk merampungkan proyek ini, diantaranya paket pertama yaitu stasiun konverter dan inverter di Kabupaten Muara Enim dan Kabupaten Bogor. Di Skiripsi ini membahas Studi Penentuan Sudut Penyalaan Sisi Konvert

Indonesia's energy needs, one of which electrical energy is now concentrated in Java-Bali with a composition of 76.3% and the remaining 23.7% outside Java-Bali. (PLN Statistics 2008). To meet the needs of the Java-Bali electricity system forward, most of which will be supplied with coal-fired power plant planned to be built mostly on Sumatra Island South (mine mouth power plant). There is now a distribution of electrical energy technology with Transmission HVDC (High Voltage Direct Current), which technically can transmit electrical energy in a large capacity and long distance. By doing so, we no longer have to build power plants near load centers (Java), and makes it possible to build a mine mouth power plant (Sumatra or Kalimantan) and transmits electrical energy to Java. So it only takes one time investment in the beginning just to build the Transmission Network and can operate for 30 years simply by issuing operational costs. There are several packages that must be done to complete the project, including the first packet is convertor station and inverter in Muara Enim and Bogor Regency. The study discusses Skiripsi Determination of Ignition Side Angle Converter and Inverter Side Channel Systems Interconnection In 500 Kv HVDC Sumatra - Java

Item Type: Thesis (Diploma)
Uncontrolled Keywords: HVDC (High Voltage Direct Current transmission ), Sudut Penyalaan sisi Konverter dan sisi Inverter. HVDC (High Voltage Direct Current transmission), the ignition angle converter and the inverter.
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro
Depositing User: Sudarman
Date Deposited: 21 Dec 2025 12:14
Last Modified: 21 Dec 2025 12:14
URI: https://repository.itpln.ac.id/id/eprint/4703

Actions (login required)

View Item
View Item