Pekerjaan dalam proyek konstruksi sangat kompleks, agar lebih efektif maka dibutuhkan alat bantu yaitu alat berat khususnya tower crane. Tower crane adalah alat bantu utama yang digunakan untuk pemindahan material secara vertikal dan horizontal dengan jangkauan sesuai dengan tinggi dan radiusnya. Dengan demikian, pekerjaan dapat tercapai dengan lebih mudah pada waktu yang relatif lebih singkat. Pada penelitian ini, dilakukan untuk memperhitungkan nilai produktivitas tower crane yang memuat bagaimana waktu siklus dan tingkat produksi tower crane, serta upaya pengoptimalisasian tower crane dan peningkatan produktivitas pekerjaan pada proyek. Pengamatan dilakukan terhadap salah satu tower crane yang ada pada Proyek Skyhouse alam sutera yang berfokus pada pekerjaan shearwall. Tujuannya adalah mengetahui besarnya produktivitas towercrane yang berisi waktu siklus tower crane, produktivitas pekerjaan melihat dari produksi tower crane, dan upaya agar tower crane bekerja lebih optimal.Dari penelitian ini diperoleh Produktivitas tower crane untuk pekerjaan shearwall dibagi menjadi 3 pekerjaan diantaranya penulangan shearwall adalah 943 kg/menit.,pemasangan bekisting 607,8140 kg/menit,pekerjaan pengecoran 38,03 kg/menit. Dan didapat nilai rata rata produktivitas sebesar 106,4061 kg/menit selain itu juga diperoleh biaya operasional tower crane sebesar 843.164,00/jam
Work in construction projects is very complex, in order to be more effective, it takes tools, namely heavy equipment, especially tower cranes. Tower cranes are the main aids used for vertical and horizontal transfer of materials with a range according to their height and radius. Thus, work can be achieved more easily in a relatively shorter time. In this study, it was conducted to take into account the productivity value of tower cranes that contain how the cycle time and production rate of tower cranes, as well as efforts to optimize tower cranes and increase work productivity on projects. Observations were made of one of the crane towers on the silk natural Skyhouse Project which focuses on shearwall work. The goal is to find out the amount of productivity of towercrane which contains the cycle time of tower crane, productivity of work seen from the production of tower cranes, and efforts to make tower cranes work more optimally. From this study obtained the productivity of tower cranes for shearwall work is divided into 3 jobs including shearwall looping is 943 kg / minute., installation of formwork 607.8140 kg / minute, casting work 38.03 kg / minute. And obtained an average productivity value of 106.4061 kg / minute in addition to the operational cost of tower crane of 843,164.00 / hour.
Item Type: | Thesis (Diploma) |
---|---|
Uncontrolled Keywords: | Waktu, Tower Crane, Produktivitas, Shearwall Time, Tower Crane, Productivity, Shearwall |
Subjects: | Bidang Keilmuan > Teknik Sipil Skripsi |
Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
Depositing User: | Sudarman |
Date Deposited: | 02 Sep 2025 16:12 |
Last Modified: | 02 Sep 2025 16:12 |
URI: | https://repository.itpln.ac.id/id/eprint/478 |